Revision history of "IMPROVING AIR QUALITY AND REDUCING LOW EMISSIONS IN THE MUNICIPALITY OF BABOSZEWO THROUGH THE EXCHANGE/MODERNISATION OF HEAT SOURCES IN INDIVIDUAL HOUSEHOLDS" (Q109135)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:1118:11, 9 October 2024DG Regio talk contribs 49,297 bytes +20 Changed label, description and/or aliases in pt
  • curprev 18:1118:11, 9 October 2024DG Regio talk contribs 49,277 bytes +12 Set a claim value: summary (P836): Projetos previstos: Substituição da atual fonte de calor (caldeiras a carvão) em 58 edifícios residenciais (18 caldeiras para biomassa e 40 caldeiras por gás) e instalação de 1 instalação fotovoltaica num edifício de utilidade pública. Os edifícios preencheram certificados de desempenho energético e documentação sob a forma de um programa de utilização funcional.

7 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:2619:26, 2 March 2023DG Regio talk contribs 46,507 bytes −572 Changed label, description and/or aliases in da, it, sk, et, fi, bg, fr, lv, de, cs, pt, ro, ga, sl, es, sv, el, hu, lt, mt, nl, hr, and other parts

25 October 2022

19 October 2022

27 July 2022

  • curprev 11:5911:59, 27 July 2022DG Regio talk contribs 45,410 bytes +26,370 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:5809:58, 1 December 2021DG Regio talk contribs 13,436 bytes +1,236 Created claim: summary (P836): Projets prévus: Remplacement de la source de chaleur actuelle (chaudières à carbone) dans 58 bâtiments résidentiels (18 chaudières à biomasse et 40 chaudières à gaz) et installation d’une installation photovoltaïque sur un bâtiment public. Les bâtiments doivent avoir rempli les certificats de performance énergétique et la documentation sous la forme d’un programme d’utilisation fonctionnelle., translated_summary
  • curprev 09:5809:58, 1 December 2021DG Regio talk contribs 12,200 bytes +243 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 09:2109:21, 20 October 2020DG Regio talk contribs 12,398 bytes +219 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:2109:21, 20 October 2020DG Regio talk contribs 12,179 bytes −217 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 09:2109:21, 20 October 2020DG Regio talk contribs 12,396 bytes +1,172 Created claim: summary (P836): Planned projects: Replacement of the current heat source (coal boilers) in 58 residential buildings (18 boilers for biomass and 40 boilers per gas) and installation of 1 photovoltaic installations on a public utility building. The buildings have completed certificates of energy performance and documentation in the form of a functional-use programme., translated_summary
  • curprev 09:2109:21, 20 October 2020DG Regio talk contribs 11,224 bytes −725 Removed claim: summary (P836): Planned activities: Replacement of the current heat source (coal boilers) in 58 residential buildings (18 biomass boilers and 40 gas boilers) and the installation of 1 photovoltaic units on the public utility. Buildings shall have the performance of the energy performance certificates and the documentation in the form of a functional utility program., remove_old_english_translation

24 September 2020

16 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

9 March 2020

  • curprev 11:2211:22, 9 March 2020DG Regio talk contribs 10,224 bytes +725 Created claim: summary (P836): Planned activities: Replacement of the current heat source (coal boilers) in 58 residential buildings (18 biomass boilers and 40 gas boilers) and the installation of 1 photovoltaic units on the public utility. Buildings shall have the performance of the energy performance certificates and the documentation in the form of a functional utility program., Adding English summary

24 February 2020

18 February 2020

31 January 2020

14 January 2020