Revision history of "Construction of a biogas CHP plant up to 1 MW in Zawady" (Q109082)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:1515:15, 7 October 2024DG Regio talk contribs 85,267 bytes −18 Changed label, description and/or aliases in pt
  • curprev 15:1515:15, 7 October 2024DG Regio talk contribs 85,285 bytes 0 Set a claim value: summary (P836): O projeto consiste na construção de uma central de biogás agrícola com uma capacidade elétrica de 0,999 MW e 1,058 MW em Zawady, Liw, distrito de Węgrowski, voivodia de Mazowiecki. A produção anual estimada de eletricidade é de 7992 MWh e a potência calorífica é de 8464 MWh. O processo é uma cogeração de alto desempenho. A eletricidade será vendida à rede elétrica e o calor será utilizado principalmente para as próprias necessidades da central de bi...

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 22:4822:48, 2 March 2023DG Regio talk contribs 82,527 bytes +148 Changed label, description and/or aliases in da, it, sk, es, ga, fi, de, el, fr, bg, sl, sv, et, lt, pt, cs, ro, nl, hr, hu, mt, lv, and other parts

25 October 2022

19 October 2022

27 July 2022

  • curprev 11:5911:59, 27 July 2022DG Regio talk contribs 80,714 bytes +51,687 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 10:0010:00, 1 December 2021DG Regio talk contribs 17,518 bytes +2,857 Created claim: summary (P836): Le projet consiste en la construction d’une usine agricole de biogaz d’une puissance électrique de 0,999 MW et d’une capacité thermique de 1,058 MW à Zawady, Liw, district de Węgrowski, voïvodie de Mazowiecki. La production annuelle d’électricité est supposée de 7 992 MWh, soit 8 464 MWh de chaleur. Le processus est la cogénération à haut rendement. L’électricité sera vendue au réseau électrique et la chaleur sera principalement utilisée pour se...
  • curprev 10:0010:00, 1 December 2021DG Regio talk contribs 14,661 bytes +163 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 09:1909:19, 20 October 2020DG Regio talk contribs 14,939 bytes +116 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:1909:19, 20 October 2020DG Regio talk contribs 14,823 bytes −150 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 09:1909:19, 20 October 2020DG Regio talk contribs 14,973 bytes +2,542 Created claim: summary (P836): The project consists of the construction of an agricultural biogas plant with an electrical capacity of 0.999 MW and 1.058 MW in Zawady, Liw, Węgrowski County, Mazowiecki Voivodeship. The estimated annual production of electricity is 7992 MWh, the heat output is 8464 MWh. The process is a high-performance cogeneration. Electricity will be sold to the power grid, and heat will be used mostly for the own needs of the biogas plant. The material sco...
  • curprev 09:1909:19, 20 October 2020DG Regio talk contribs 12,431 bytes −2,138 Removed claim: summary (P836): The project involves the construction of an agricultural biogas plant with an electrical capacity of 0.999 MW and a heat output of 1.058 MW in the municipality of Zawady, the district of Liw, the district of Mazowieckie Province. The projected annual electricity production is 7 992 MWh, heat 8 464 MWh. The process is a high efficiency cogeneration. Electricity will be sold to the electricity grid and most of the heat used for the own biogas pl...

24 September 2020

16 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

9 March 2020

  • curprev 11:2211:22, 9 March 2020DG Regio talk contribs 12,843 bytes +2,138 Created claim: summary (P836): The project involves the construction of an agricultural biogas plant with an electrical capacity of 0.999 MW and a heat output of 1.058 MW in the municipality of Zawady, the district of Liw, the district of Mazowieckie Province. The projected annual electricity production is 7 992 MWh, heat 8 464 MWh. The process is a high efficiency cogeneration. Electricity will be sold to the electricity grid and most of the heat used for the own biogas plan...

24 February 2020

18 February 2020

31 January 2020

14 January 2020