Revision history of "Warm side of the city" (Q109062)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 03:5003:50, 11 October 2024DG Regio talk contribs 90,473 bytes +47 Set a claim value: summary (P836): No âmbito do projeto, a cidade de Ostrów Mazowiecka tenciona aprofundar a modernização térmica das instalações públicas urbanas, ou seja, o Centro para a Inclusão Social, o MOSiR e a Equipa Escolar n.o 2, a fim de aumentar a eficiência energética dos edifícios. Ao mesmo tempo, o âmbito específico dos trabalhos deve abranger as seguintes atividades: aquecimento de objectos, incluindo paredes e tectos exteriores, substituição de janelas e portas exter...

12 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

25 October 2022

19 October 2022

2 July 2022

  • curprev 14:2314:23, 2 July 2022DG Regio talk contribs 83,970 bytes +53,911 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 10:0010:00, 1 December 2021DG Regio talk contribs 18,078 bytes +3,081 Created claim: summary (P836): Dans le cadre du projet, la ville d’Ostrów Mazowiecka prévoit une thermomodernisation profonde des bâtiments publics urbains, c’est-à-dire. Centre d’intégration sociale, MOSiR et complexe scolaire no 2 pour accroître l’efficacité énergétique des bâtiments. Dans le même temps, le champ d’application détaillé des travaux comprend: isolation des objets, y compris les murs et les planchers extérieurs, remplacement des fenêtres et des portes extérieu...
  • curprev 10:0010:00, 1 December 2021DG Regio talk contribs 14,997 bytes +82 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 09:1809:18, 20 October 2020DG Regio talk contribs 15,356 bytes +82 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:1809:18, 20 October 2020DG Regio talk contribs 15,274 bytes −75 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 09:1809:18, 20 October 2020DG Regio talk contribs 15,349 bytes +2,715 Created claim: summary (P836): As part of the project, the City of Ostrów Mazowiecka plans to deepen the thermal modernisation of urban public facilities, i.e. The Centre for Social Inclusion, MOSiR and School Team No. 2 to increase the energy efficiency of buildings. At the same time, the specific scope of the work shall cover activities: warming of objects including external walls and ceilings, replacement of windows and external doors, installation of photovoltaic cells, m...
  • curprev 09:1809:18, 20 October 2020DG Regio talk contribs 12,634 bytes −2,218 Removed claim: summary (P836): In the framework of the project, the City of Ostrów Mazowiecka plans a deep thermal modernisation of urban utilities, i.e. The Centre for Social Integration, MOSiR and the Team of Schools No 2 in order to increase the energy efficiency of buildings. The detailed scope of the work will be carried out at the same time: insulation, replacement of windows and external doors, installation of photovoltaic cells, modernisation of the heating system:...

16 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

9 March 2020

  • curprev 11:2211:22, 9 March 2020DG Regio talk contribs 13,130 bytes +2,218 Created claim: summary (P836): In the framework of the project, the City of Ostrów Mazowiecka plans a deep thermal modernisation of urban utilities, i.e. The Centre for Social Integration, MOSiR and the Team of Schools No 2 in order to increase the energy efficiency of buildings. The detailed scope of the work will be carried out at the same time: insulation, replacement of windows and external doors, installation of photovoltaic cells, modernisation of the heating system: re...

24 February 2020

18 February 2020

31 January 2020

14 January 2020