Revision history of "Thermal modernisation of public buildings in Bielany Municipality" (Q109014)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:1418:14, 8 October 2024DG Regio talk contribs 91,408 bytes +10 Changed label, description and/or aliases in pt
  • curprev 18:1418:14, 8 October 2024DG Regio talk contribs 91,398 bytes +55 Set a claim value: summary (P836): O projeto tem por objeto a transição do município de Bielany para uma economia de baixas emissões através da termomodernização e instalação de painéis fotovoltaicos em edifícios de serviços públicos. O âmbito do projeto abrange as seguintes fases de investimento: É a fase 1. Realizar uma auditoria energética e, em seguida, desenvolver a documentação técnica necessária do projeto de termomodernização e da instalação de painéis fotovoltaicos. É a fase...

7 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:5021:50, 2 March 2023DG Regio talk contribs 87,808 bytes −637 Changed label, description and/or aliases in da, it, sk, fr, nl, fi, el, ga, et, pt, sl, es, ro, lt, sv, de, cs, mt, hu, bg, hr, lv, and other parts

25 October 2022

19 October 2022

2 July 2022

  • curprev 14:2214:22, 2 July 2022DG Regio talk contribs 86,771 bytes +55,760 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 10:3910:39, 1 December 2021DG Regio talk contribs 18,507 bytes +3,217 Created claim: summary (P836): Le projet concerne la transition de la municipalité de Bielany vers une économie à faibles émissions grâce à la thermomodernisation et à l’installation de panneaux photovoltaïques dans les bâtiments publics. La portée du projet comprend les étapes suivantes de l’investissement: Étape 1. Réalisation d’un audit énergétique, puis préparation de la documentation technique nécessaire du projet de modernisation thermique et de l’installation de pannea...
  • curprev 10:3910:39, 1 December 2021DG Regio talk contribs 15,290 bytes +134 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 17:5617:56, 17 October 2020DG Regio talk contribs 15,595 bytes +124 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:5617:56, 17 October 2020DG Regio talk contribs 15,471 bytes −127 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:5617:56, 17 October 2020DG Regio talk contribs 15,598 bytes +2,871 Created claim: summary (P836): The subject of the project is the transition of Bielany commune to low emission economy through thermomodernisation and installation of photovoltaic panels in public utility buildings. The scope of the project covers the following investment stages: It’s stage 1. Carry out an energy audit, then develop the necessary technical documentation of the thermomodernisation project and the installation of photovoltaic panels. It’s stage 2. Carrying out...
  • curprev 17:5617:56, 17 October 2020DG Regio talk contribs 12,727 bytes −2,389 Removed claim: summary (P836): The project is the transition of the municipality of Bielany to a low carbon economy through the thermal modernisation and installation of solar panels in public buildings. The scope of the project consists of the following investments: Step 1. The completion of the energy audit, the subsequent development of the necessary technical documentation for the thermal modernisation project and the installation of solar panels. Step 2. Work on modern...

24 September 2020

16 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

9 March 2020

  • curprev 11:2111:21, 9 March 2020DG Regio talk contribs 13,401 bytes +2,389 Created claim: summary (P836): The project is the transition of the municipality of Bielany to a low carbon economy through the thermal modernisation and installation of solar panels in public buildings. The scope of the project consists of the following investments: Step 1. The completion of the energy audit, the subsequent development of the necessary technical documentation for the thermal modernisation project and the installation of solar panels. Step 2. Work on modernis...

24 February 2020

18 February 2020

31 January 2020

14 January 2020