Revision history of "Increasing energy efficiency in public buildings in Stromiec Municipality" (Q108986)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 03:5003:50, 11 October 2024DG Regio talk contribs 92,976 bytes −1 Changed label, description and/or aliases in pt
  • curprev 03:5003:50, 11 October 2024DG Regio talk contribs 92,977 bytes 0 Set a claim value: summary (P836): O projeto «Aumentar a eficiência energética em edifícios de serviços públicos no município de Stromiec» incluirá: 1. Edifício do Gabinete Municipal – Rua Piaski 4: Aquecimento do telhado, Modernização da divisória O piso no solo – aquecimento, Modernização das anteparas da parede exterior da gr. subterrânea 38 cm – aquecimento, Aquecimento das paredes em camadas gr. 43 cm, Modernização das anteparas do teto exterior de alimentação – aquecimento, Sub...

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

25 October 2022

19 October 2022

2 July 2022

  • curprev 14:2114:21, 2 July 2022DG Regio talk contribs 89,064 bytes +57,627 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 10:3910:39, 1 December 2021DG Regio talk contribs 18,635 bytes +3,245 Created claim: summary (P836): Le projet «Améliorer l’efficacité énergétique dans les bâtiments publics de la municipalité de Stromiec» comprendra: 1. Bâtiment des bureaux municipaux — 4 rue Piaski: Isolation du toit, Modernisation des cloisons Planchers au sol — réchauffement, Modernisation des cloisons Mur extérieur du souterrain g. 38 cm — réchauffement, Réchauffement des murs sandwich à 43 cm, Modernisation des cloisons Zerański plafond extérieur — réchauffement, Remplace...
  • curprev 10:3910:39, 1 December 2021DG Regio talk contribs 15,390 bytes +166 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 17:5617:56, 17 October 2020DG Regio talk contribs 15,663 bytes +132 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:5617:56, 17 October 2020DG Regio talk contribs 15,531 bytes −122 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:5617:56, 17 October 2020DG Regio talk contribs 15,653 bytes +2,937 Created claim: summary (P836): The project “Increasing energy efficiency in public utility buildings in Stromiec Municipality” will include: 1. Building of the Municipal Office – Piaski Street 4: Roof warming, Modernisation of the partition The floor on the ground – warming, Modernisation of the bulkheads of the outer wall of the underground gr. 38 cm – warming, Warming of layered walls gr. 43 cm, Modernisation of the bulkheads of the feeding external ceiling – warming, Repla...
  • curprev 17:5617:56, 17 October 2020DG Regio talk contribs 12,716 bytes −2,477 Removed claim: summary (P836): The project ‘Increasing energy efficiency in public buildings in the municipality of Strom’ will include: 1. Office of the Municipal Office — street Piaski 4: The insulation of the roof, the modernisation of the subdivision of the subdivision of the building on the ground — warming, modernisation of the boundary of the Stricuan external bulkhead floor of 38 cm — warming, insulation of the wall of 43 cm, modernisation of the envelope of Stroera...

24 September 2020

16 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

9 March 2020

  • curprev 11:2111:21, 9 March 2020DG Regio talk contribs 13,471 bytes +2,477 Created claim: summary (P836): The project ‘Increasing energy efficiency in public buildings in the municipality of Strom’ will include: 1. Office of the Municipal Office — street Piaski 4: The insulation of the roof, the modernisation of the subdivision of the subdivision of the building on the ground — warming, modernisation of the boundary of the Stricuan external bulkhead floor of 38 cm — warming, insulation of the wall of 43 cm, modernisation of the envelope of Stroerańs...

24 February 2020

18 February 2020

31 January 2020

14 January 2020