Revision history of "THERMAL MODERNISATION OF THE PRIMARY SCHOOL BUILDING IN ANDRZEJEW" (Q108975)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:1316:13, 10 October 2024DG Regio talk contribs 94,472 bytes +1 Changed label, description and/or aliases in pt
  • curprev 16:1316:13, 10 October 2024DG Regio talk contribs 94,471 bytes −9 Set a claim value: summary (P836): O projeto Mon. «Termomodernização da escola primária de Andrzejew» consiste na modernização energética de um dos edifícios públicos de Andrzejew, que alberga uma escola primária. Antes da execução do projeto, foi realizada uma auditoria energética, com base na qual foram identificadas as seguintes tarefas: 1. Aquecimento das paredes exteriores; 2. Aquecimento dos tectos; 3. Aquecimento do telhado; 4. Aquecimento do chão; 5. Substituição de obras de...

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

25 October 2022

19 October 2022

2 July 2022

  • curprev 14:2014:20, 2 July 2022DG Regio talk contribs 87,635 bytes +56,474 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 10:3910:39, 1 December 2021DG Regio talk contribs 18,441 bytes +3,209 Created claim: summary (P836): Projet intitulé La thermomodernisation du bâtiment de l’école primaire à Andrzejewo consiste en la modernisation énergétique de l’un des bâtiments publics d’Andrzejewo, qui abrite l’école primaire. Avant de poursuivre le projet, un audit énergétique a été réalisé, sur la base duquel les tâches ont été définies: 1. Isolation des murs extérieurs; 2. Le réchauffement de l’édifice; 3. Le réchauffement du toit; 4. Le réchauffement du sol; 5. Remplace...
  • curprev 10:3910:39, 1 December 2021DG Regio talk contribs 15,232 bytes +128 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 17:5517:55, 17 October 2020DG Regio talk contribs 15,543 bytes +124 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:5517:55, 17 October 2020DG Regio talk contribs 15,419 bytes −125 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:5517:55, 17 October 2020DG Regio talk contribs 15,544 bytes +2,842 Created claim: summary (P836): Project Mon. “Termomodernisation of the primary school in Andrzejew” consists of the energy modernisation of one of the public buildings in Andrzejew, which houses a primary school. Prior to the implementation of the project, an energy audit was carried out, on the basis of which tasks were identified: 1. Warming of the outer walls; 2. Warming of ceilings; 3. Roof warming; 4. Floor warming; 5. Replacement of window joinery; 6. Replacement of doo...
  • curprev 17:5517:55, 17 October 2020DG Regio talk contribs 12,702 bytes −2,327 Removed claim: summary (P836): The project entitled: The “Thermal upgrade of a basic school building in Andrzej Andrzewo” consists of the energy modernisation of one of the public buildings in Andrzej Andrzewo, where the primary school is located. Prior to the start of the project, an energy audit was carried out, on the basis of which the tasks were identified: 1. Insulation of external walls; 2. Insulation of flat roof; 3. Roof insulation; 4. Floor insulation; 5. Replacem...

24 September 2020

16 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

9 March 2020

  • curprev 11:2111:21, 9 March 2020DG Regio talk contribs 13,313 bytes +2,327 Created claim: summary (P836): The project entitled: The “Thermal upgrade of a basic school building in Andrzej Andrzewo” consists of the energy modernisation of one of the public buildings in Andrzej Andrzewo, where the primary school is located. Prior to the start of the project, an energy audit was carried out, on the basis of which the tasks were identified: 1. Insulation of external walls; 2. Insulation of flat roof; 3. Roof insulation; 4. Floor insulation; 5. Replacemen...

24 February 2020

18 February 2020

31 January 2020

14 January 2020