Revision history of "Construction of the installation of 39.96 Kw photovoltaic panels and installation of two micro-installations of 38 kW heat pumps each at Chemikal Partners in Zielonka Stara." (Q108927)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:1515:15, 7 October 2024DG Regio talk contribs 92,857 bytes −41 Changed label, description and/or aliases in pt
  • curprev 15:1515:15, 7 October 2024DG Regio talk contribs 92,898 bytes −14 Set a claim value: summary (P836): O investimento previsto na Chemikal Partners em Zielonka Stara 2a, parcela 152/2 no município de Zwoleń consistirá em: Construção da instalação de painéis fotovoltaicos com uma capacidade de 39 960 Wp. composta por 148 painéis colocados no telhado de um edifício de produção e edifício de escritórios da Chemikal Partners e dois inversores de 20,75 kWp cada. A área de conversão resultante do projeto é de cerca de 272 m2. A instalação será ligada ao qu...

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:2619:26, 2 March 2023DG Regio talk contribs 90,154 bytes +1,384 Changed label, description and/or aliases in da, it, sk, cs, lv, hr, es, fi, ro, fr, pt, hu, lt, et, ga, nl, el, sl, sv, bg, de, mt, and other parts

25 October 2022

19 October 2022

2 July 2022

  • curprev 14:1914:19, 2 July 2022DG Regio talk contribs 87,097 bytes +55,889 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 10:3810:38, 1 December 2021DG Regio talk contribs 18,553 bytes +3,028 Created claim: summary (P836): L’investissement prévu dans Chemikal Partners à Zielonka Stara 2a, parcelle 152/2 dans la municipalité de Zwoleń, consistera en: Installation de panneaux photovoltaïques d’une capacité de 39 960 Wp. comprenant 148 panneaux sur le toit du bâtiment de production et de bureaux de Chemikal Partners et deux onduleurs d’une puissance de 20,75 kWp chacun. La superficie à convertir à la suite du projet est d’environ 272 m². L’installation sera connectée...
  • curprev 10:3810:38, 1 December 2021DG Regio talk contribs 15,525 bytes +273 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 17:4917:49, 17 October 2020DG Regio talk contribs 15,691 bytes +233 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:4917:49, 17 October 2020DG Regio talk contribs 15,458 bytes −203 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:4917:49, 17 October 2020DG Regio talk contribs 15,661 bytes +2,745 Created claim: summary (P836): The planned investment in Chemikal Partners in Zielonka Stara 2a, plot 152/2 in the municipality of Zwoleń will consist of: Construction of the installation of photovoltaic panels with a capacity of 39 960Wp. consisting of 148 panels placed on the roof of a production building and office building of Chemikal Partners and two 20.75 kWp inverters each. The area for conversion as a result of the project is about 272 m². The installation will be con...
  • curprev 17:4917:49, 17 October 2020DG Regio talk contribs 12,916 bytes −2,317 Removed claim: summary (P836): The planned investment in Chemikal Partners in Zielonka Stara 2a, parcel 152/2 in the municipality of Zvolen, will consist of: Construction of the installation of photovoltaic panels under 39 960Wp.consisting of 148 sub-panels on the roof of a production building and an office building of Chemikal Partners and two inverters having a power of 20,75 kWp each. The area to be converted as a result of the project is approximately 272 m². The instal...

24 September 2020

16 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

9 March 2020

  • curprev 11:1911:19, 9 March 2020DG Regio talk contribs 13,528 bytes +2,317 Created claim: summary (P836): The planned investment in Chemikal Partners in Zielonka Stara 2a, parcel 152/2 in the municipality of Zvolen, will consist of: Construction of the installation of photovoltaic panels under 39 960Wp.consisting of 148 sub-panels on the roof of a production building and an office building of Chemikal Partners and two inverters having a power of 20,75 kWp each. The area to be converted as a result of the project is approximately 272 m². The installa...

24 February 2020

18 February 2020

31 January 2020

14 January 2020