Revision history of "Innovative 110 kV power lines poles" (Q107895)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:1418:14, 8 October 2024DG Regio talk contribs 87,925 bytes +6 Changed label, description and/or aliases in pt
  • curprev 18:1418:14, 8 October 2024DG Regio talk contribs 87,919 bytes −557 Set a claim value: summary (P836): O projeto diz respeito à realização de trabalhos de investigação e desenvolvimento industrial, que resultarão num novo tipo de poste, que será utilizado em redes elétricas de alta tensão de 110 kV. Os postes de alta tensão estão disponíveis no mercado, no entanto, com menor desempenho. A coluna inovadora caracterizar-se-á por um peso reduzido de 8 %, acrescido de 5 % de rigidez à torção e os serviços prestados com a sua utilização permitirão poupar...

7 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:2319:23, 2 March 2023DG Regio talk contribs 85,718 bytes +10,458 Changed label, description and/or aliases in it, da, lv, fi, bg, sk, cs, hr, pt, fr, nl, de, el, ro, hu, mt, lt, sv, sl, es, et, ga, and other parts

20 October 2022

2 July 2022

  • curprev 13:5613:56, 2 July 2022DG Regio talk contribs 74,447 bytes +44,637 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 10:2910:29, 1 December 2021DG Regio talk contribs 17,735 bytes +3,086 Created claim: summary (P836): Le projet concerne la conduite de travaux de recherche et de développement industriels, qui mèneront à la mise au point d’un nouveau type de poteau qui sera utilisé dans les réseaux électriques à haute tension de 110 kV. Les poteaux haute tension sont cependant disponibles sur le marché, avec des performances plus faibles. Le pôle innovant sera caractérisé par un poids réduit de 8 %, augmenté de 5 % de rigidité de torsion et les services réalisé...
  • curprev 10:2910:29, 1 December 2021DG Regio talk contribs 14,649 bytes +110 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 17:1517:15, 17 October 2020DG Regio talk contribs 14,978 bytes +94 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:1517:15, 17 October 2020DG Regio talk contribs 14,884 bytes −103 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:1517:15, 17 October 2020DG Regio talk contribs 14,987 bytes +2,234 Created claim: summary (P836): The project concerns carrying out industrial research and development work, which will result in a new type of pole, which will be used in high voltage power grids of 110 kV. High-voltage poles are available on the market, however, with lower performance. The innovative column will be characterised by a reduced weight of 8 %, increased by 5 % torsion stiffness and the services performed with its use will save 15 % of installation work hours. Pol...
  • curprev 17:1517:15, 17 October 2020DG Regio talk contribs 12,753 bytes −2,110 Removed claim: summary (P836): The project concerns the conduct of industrial research and development which will result in the development of a new type of post to be applied to the high-voltage electricity grid 110 kV. High voltage poles, however, are available on the market, but with lower parameters. The innovative pole will be characterised by a 8 % reduction in mass, an increase of 5 % in the rigid turn of the service and the services provided using it will save 15 %...

17 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

9 March 2020

  • curprev 09:5809:58, 9 March 2020DG Regio talk contribs 13,139 bytes +2,110 Created claim: summary (P836): The project concerns the conduct of industrial research and development which will result in the development of a new type of post to be applied to the high-voltage electricity grid 110 kV. High voltage poles, however, are available on the market, but with lower parameters. The innovative pole will be characterised by a 8 % reduction in mass, an increase of 5 % in the rigid turn of the service and the services provided using it will save 15 % of...

24 February 2020

18 February 2020

31 January 2020

14 January 2020