Revision history of "Reconstruction of the building – separation of teaching rooms for the needs of the School – Preschool Team in order to increase access to preschool education in the Bełżec Commune" (Q107573)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:0418:04, 9 October 2024DG Regio talk contribs 92,627 bytes +8 Changed label, description and/or aliases in pt
  • curprev 18:0418:04, 9 October 2024DG Regio talk contribs 92,619 bytes −291 Set a claim value: summary (P836): O principal objetivo do projeto é melhorar o nível de acesso e a qualidade dos serviços pré-escolares oferecidos no âmbito das atividades da Equipa Escolar e Pré-Escolar (ZS-P) em Bełżec. Prevê-se que a prioridade seja alcançada através de acções de infra-estruturas, incluindo: — reconstrução do edifício ZS-P com a separação de salas para crianças em idade pré-escolar (incluindo 3-4 anos), no qual serão construídas 4 salas de ensino com instalações...

23 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:2319:23, 2 March 2023DG Regio talk contribs 89,375 bytes +4,090 Changed label, description and/or aliases in it, lv, sk, da, ro, es, el, fr, sv, lt, et, ga, fi, hr, nl, pt, hu, bg, sl, cs, mt, and other parts

20 October 2022

27 July 2022

  • curprev 11:4711:47, 27 July 2022DG Regio talk contribs 84,469 bytes +52,174 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 10:2110:21, 1 December 2021DG Regio talk contribs 18,724 bytes +3,434 Created claim: summary (P836): L’objectif principal du projet est d’améliorer le niveau d’accès et la qualité des services préscolaires offerts dans le cadre des activités de l’équipe scolaire et préscolaire (ZS-P) à Bełżec. La priorité doit être atteinte par la mise en œuvre d’actions en matière d’infrastructures, notamment: — reconstruction du bâtiment ZS-P avec séparation des salles pour les enfants d’âge préscolaire (y compris à l’âge de 3 à 4 ans) dans lequel seront cons...
  • curprev 10:2110:21, 1 December 2021DG Regio talk contribs 15,290 bytes +291 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 10:1310:13, 20 October 2020DG Regio talk contribs 15,440 bytes +247 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:1310:13, 20 October 2020DG Regio talk contribs 15,193 bytes −251 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:1310:13, 20 October 2020DG Regio talk contribs 15,444 bytes +2,499 Created claim: summary (P836): The main objective of the project is to improve the level of access and quality of pre-school services offered within the activities of the School and Preschool Team (ZS-P) in Bełżec. Priority is planned to be achieved through infrastructure actions including: — reconstruction of the ZS-P building with the separation of rooms for children of preschool age (including 3-4 years) in which 4 teaching rooms with sanitary facilities for 63 children an...
  • curprev 10:1310:13, 20 October 2020DG Regio talk contribs 12,945 bytes −2,470 Removed claim: summary (P836): The main objective of the project is to improve the level of access and quality of pre-school services offered in the activities of the School and School Group (ZS-P) in Bełwiec. The achievement of the priority shall be achieved through the implementation of infrastructure actions, including, but not limited to: — converting the ZS-P building with a release of premises for pre-school children (including those aged 3-4), which will create 4 tea...

24 September 2020

16 July 2020

22 June 2020

10 June 2020

7 June 2020

6 June 2020

26 March 2020

9 March 2020

  • curprev 09:4909:49, 9 March 2020DG Regio talk contribs 13,693 bytes +2,470 Created claim: summary (P836): The main objective of the project is to improve the level of access and quality of pre-school services offered in the activities of the School and School Group (ZS-P) in Bełwiec. The achievement of the priority shall be achieved through the implementation of infrastructure actions, including, but not limited to: — converting the ZS-P building with a release of premises for pre-school children (including those aged 3-4), which will create 4 teach...

24 February 2020

18 February 2020

31 January 2020

14 January 2020