Revision history of "Development of the infrastructure of the degraded area through the construction of a building with social functions in the Izbica Municipality" (Q107546)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:1316:13, 10 October 2024DG Regio talk contribs 87,778 bytes −7 Changed label, description and/or aliases in pt
  • curprev 16:1316:13, 10 October 2024DG Regio talk contribs 87,785 bytes −68 Set a claim value: summary (P836): O principal objetivo do projeto é realizar uma série de atividades que levarão à remoção da área degradada da crise, através de obras de demolição e, em seguida, a construção do edifício para efeitos do Centro de Turismo e Educação e Cultura. O âmbito do projeto inclui a construção da instalação através da demolição da infraestrutura existente e, em seguida, a construção de um edifício completo e o desenvolvimento da área em torno dele. O grupo-alvo...

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:2319:23, 2 March 2023DG Regio talk contribs 84,318 bytes +1,559 Changed label, description and/or aliases in it, da, sk, cs, es, sv, lv, et, lt, de, bg, ga, fi, ro, hr, fr, pt, el, sl, mt, hu, and other parts

20 October 2022

2 July 2022

  • curprev 13:5113:51, 2 July 2022DG Regio talk contribs 81,946 bytes +52,026 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 10:2410:24, 1 December 2021DG Regio talk contribs 17,945 bytes +2,856 Created claim: summary (P836): L’objectif principal du projet est de réaliser un certain nombre d’activités qui mèneront à l’évacuation de la zone dégradée de la situation de crise, par des travaux de démolition puis la construction du bâtiment aux fins du Centre touristique, éducatif et culturel. La portée du projet comprend la construction d’une installation en démolissant l’infrastructure existante, puis en érigeant un bâtiment complet et en développant le site qui l’entou...
  • curprev 10:2410:24, 1 December 2021DG Regio talk contribs 15,089 bytes +217 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 10:0610:06, 20 October 2020DG Regio talk contribs 15,313 bytes +204 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:0610:06, 20 October 2020DG Regio talk contribs 15,109 bytes −190 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:0610:06, 20 October 2020DG Regio talk contribs 15,299 bytes +2,627 Created claim: summary (P836): The main objective of the project is to carry out a number of activities that will lead to the removal of the degraded area from the crisis, through demolition works and then the construction of the building for the purpose of the Tourism and Educational and Culture Centre. The scope of the project includes the construction of the facility by demolishing the existing infrastructure and then erecting a complete building and developing the area ar...
  • curprev 10:0610:06, 20 October 2020DG Regio talk contribs 12,672 bytes −2,107 Removed claim: summary (P836): The main objective of the project is to carry out a number of activities that will lead to the removal of a degraded region from a crisis situation, by demolition works and, subsequently, the construction of a building for the purposes of the Tourist and Cultural Centre. The scope of the project includes the creation of a building by the demolition of existing infrastructure and the subsequent construction of a complete building and the develo...

24 September 2020

16 July 2020

22 June 2020

10 June 2020

7 June 2020

6 June 2020

26 March 2020

9 March 2020

  • curprev 09:4509:45, 9 March 2020DG Regio talk contribs 13,057 bytes +2,107 Created claim: summary (P836): The main objective of the project is to carry out a number of activities that will lead to the removal of a degraded region from a crisis situation, by demolition works and, subsequently, the construction of a building for the purposes of the Tourist and Cultural Centre. The scope of the project includes the creation of a building by the demolition of existing infrastructure and the subsequent construction of a complete building and the developm...

24 February 2020

18 February 2020

31 January 2020

14 January 2020