Revision history of "Ordering and developing public space through the reconstruction of sports and recreational facilities in order to restore functional functions in Obroki" (Q107530)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:1518:15, 9 October 2024DG Regio talk contribs 69,691 bytes −8 Changed label, description and/or aliases in pt
  • curprev 18:1518:15, 9 October 2024DG Regio talk contribs 69,699 bytes −20 Set a claim value: summary (P836): O principal objetivo do projeto é travar a marginalização de espaços degradados e restaurar as suas funções e melhorar a qualidade de vida da comunidade local e o nível de segurança pública. O escopo do projeto é mudar a forma como o terreno é desenvolvido e formar uma superfície, a fim de criar instalações esportivas e recreativas com reconstrução e expansão do parque infantil e campo de esportes existente localizado no lote n.o 265 na aldeia de Ob...

7 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 18:4618:46, 2 March 2023DG Regio talk contribs 66,545 bytes +56 Changed label, description and/or aliases in da, sk, lv, it, et, fr, ga, ro, el, sv, bg, hu, de, es, cs, sl, mt, pt, lt, hr, nl, fi, and other parts

27 October 2022

26 October 2022

20 October 2022

2 July 2022

  • curprev 13:5013:50, 2 July 2022DG Regio talk contribs 64,369 bytes +40,523 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 10:0810:08, 1 December 2021DG Regio talk contribs 14,884 bytes +2,087 Created claim: summary (P836): L’objectif principal du projet est d’arrêter les processus de marginalisation des espaces dégradés et de restaurer leurs fonctions, et d’améliorer la qualité de vie de la communauté locale et le niveau de sécurité publique. La portée du projet comprend un changement dans la méthode d’utilisation des sols et de formation des trottoirs afin de créer des installations sportives et récréatives avec la reconstruction et l’extension de l’aire de jeux...
  • curprev 10:0810:08, 1 December 2021DG Regio talk contribs 12,797 bytes +235 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 10:0610:06, 20 October 2020DG Regio talk contribs 13,003 bytes +214 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:0610:06, 20 October 2020DG Regio talk contribs 12,789 bytes −237 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:0610:06, 20 October 2020DG Regio talk contribs 13,026 bytes +1,968 Created claim: summary (P836): The main objective of the project is to halt the marginalisation of degraded spaces and restore their functions and improve the quality of life of the local community and the level of public security. The scope of the project is to change the way the plot is developed and to form a surface in order to create sports and recreational facilities with reconstruction and expansion of the existing playground for children and sports field located on th...
  • curprev 10:0610:06, 20 October 2020DG Regio talk contribs 11,058 bytes −1,471 Removed claim: summary (P836): The main aim of the project is to halt the marginalisation of degraded land and restore their functions and to improve the quality of life of the local community and the level of public security. The scope of the project involves a change in land use and paving for the creation of sports and leisure facilities with the reconstruction and extension of the existing playground for children and the sports field located on parcel No eard. 265 in th...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:4509:45, 9 March 2020DG Regio talk contribs 11,242 bytes +1,471 Created claim: summary (P836): The main aim of the project is to halt the marginalisation of degraded land and restore their functions and to improve the quality of life of the local community and the level of public security. The scope of the project involves a change in land use and paving for the creation of sports and leisure facilities with the reconstruction and extension of the existing playground for children and the sports field located on parcel No eard. 265 in the...

24 February 2020

18 February 2020

31 January 2020

14 January 2020