Revision history of "Check of the bars" (Q10621)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:1106:11, 9 October 2024DG Regio talk contribs 42,160 bytes 0 Set a claim value: summary (P836): O objectivo do projecto é o desenvolvimento de equipamentos electrónicos para verificar a posição da barreira do equipamento de segurança da travessia em função do tempo (dobramento e elevação) e verificar a integridade das barreiras de vigas.

23 March 2024

15 January 2024

11 June 2023

17 February 2023

2 July 2022

  • curprev 13:2313:23, 2 July 2022DG Regio talk contribs 39,491 bytes +21,420 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

28 November 2021

  • curprev 09:0109:01, 28 November 2021DG Regio talk contribs 14,314 bytes +1,092 Created claim: summary (P836): Le projet a pour objet la mise au point d’un dispositif électronique de contrôle de la position des barrières de l’équipement de sécurité du passage à niveau en fonction du temps (de basculement et de levage) et de vérification de l’intégrité des portails., translated_summary
  • curprev 09:0109:01, 28 November 2021DG Regio talk contribs 13,222 bytes +87 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

15 July 2020

19 June 2020

6 June 2020

25 March 2020

3 March 2020

25 February 2020

  • curprev 16:3116:31, 25 February 2020DG Regio talk contribs 11,442 bytes +596 Created claim: summary (P836): The purpose of the project is the development of an electronic device for checking the position of the shore of the ivy gate, depending on the time (tilting and lifting) and checking the integrity of the bank in brackets. a., Adding English summary

17 February 2020

11 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020