Revision history of "EXTENSION OF WATER SUPPLY INFRASTRUCTURE IN DRELÓW COMMUNE" (Q105688)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

26 October 2022

21 October 2022

2 July 2022

  • curprev 13:1113:11, 2 July 2022DG Regio talk contribs 57,121 bytes +35,037 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:5909:59, 1 December 2021DG Regio talk contribs 14,167 bytes +1,983 Created claim: summary (P836): Le projet est situé dans la zone de la municipalité de Drelów. Le réseau d’approvisionnement en eau prévu pour la construction comprendra les villes de Łózki et Kwasówka. L’option a été choisie pour la construction d’un réseau d’approvisionnement en eau d’une longueur de 14,707 km. Le réseau d’approvisionnement en eau construit sera relié au réseau d’approvisionnement en eau construit, les habitants de la ville de Łózki et acidówka, qui ont des...
  • curprev 09:5909:59, 1 December 2021DG Regio talk contribs 12,184 bytes +150 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:5416:54, 17 October 2020DG Regio talk contribs 12,473 bytes +118 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5416:54, 17 October 2020DG Regio talk contribs 12,355 bytes −148 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5416:54, 17 October 2020DG Regio talk contribs 12,503 bytes +1,756 Created claim: summary (P836): The project is located in the area of Drelów commune.The water supply network will be planned to include the towns of Łózki and Kwasówka.The construction of a 14.707 km long water supply network has been chosen.The built water supply network will be connected to the built-up water supply network inhabitants of Łózki and acidka, who have individual domestic sewage treatment plants. The number of connected users is 176 people. In each town there w...
  • curprev 16:5416:54, 17 October 2020DG Regio talk contribs 10,747 bytes −1,306 Removed claim: summary (P836): The project is located in the area of the municipality of Drelów.Planable to build the water supply network will consist of the settlements of the municipalities of Łódzki and Kwesaka.For the implementation of the option of building a 14.707 km-long water mains network, the inhabitants of the town of Łódzki and the Kwasówka will be connected to the water supply network and have individual domestic sewage treatment plants. The number of connect...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:3409:34, 9 March 2020DG Regio talk contribs 10,765 bytes +1,306 Created claim: summary (P836): The project is located in the area of the municipality of Drelów.Planable to build the water supply network will consist of the settlements of the municipalities of Łódzki and Kwesaka.For the implementation of the option of building a 14.707 km-long water mains network, the inhabitants of the town of Łódzki and the Kwasówka will be connected to the water supply network and have individual domestic sewage treatment plants. The number of connected...

24 February 2020

18 February 2020

31 January 2020

14 January 2020