Revision history of "Ordering water and sewage management in the municipality of Jeziorzany – Stage II" (Q105651)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1719:17, 2 March 2023DG Regio talk contribs 88,243 bytes +2,068 Changed label, description and/or aliases in lv, it, da, sk, fi, ga, et, ro, sv, de, fr, bg, hu, cs, sl, mt, es, pt, nl, hr, el, lt, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 13:1013:10, 2 July 2022DG Regio talk contribs 84,062 bytes +54,356 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:5809:58, 1 December 2021DG Regio talk contribs 17,310 bytes +3,080 Created claim: summary (P836): Il s’agit de la construction d’un système d’assainissement sanitaire à Wola Blizocka et de la construction d’une prise d’eau dans le Krępa m. La portée prévue des travaux comprend la construction d’égouts par gravité avec raccords de maison et d’un pipeline sous pression avec une station de pompage des eaux usées. Nombre de personnes raccordées au réseau d’égout 172 + 60 saisonniers. En outre, une prise d’eau secondaire sera construite pour la s...
  • curprev 09:5809:58, 1 December 2021DG Regio talk contribs 14,230 bytes +154 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:5016:50, 17 October 2020DG Regio talk contribs 14,515 bytes +142 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5016:50, 17 October 2020DG Regio talk contribs 14,373 bytes −137 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5016:50, 17 October 2020DG Regio talk contribs 14,510 bytes +2,723 Created claim: summary (P836): The task consists of the construction of sanitary sewage system in Wola Blizocka and the construction of water intake in the town of Krępa. The planned scope of works includes the construction of gravitational drainage with home connections and a discharge pipe with a sewage pumping plant. Number of people connected to the sewage system 172+ 60 seasonal. In addition, a replacement water intake will be built for the water treatment station operat...
  • curprev 16:5016:50, 17 October 2020DG Regio talk contribs 11,787 bytes −2,288 Removed claim: summary (P836): The task consists of the construction of a sewage system in m. The planned scope of the works includes the execution of a gravity sewerage including the domestic connection and the discharge pipeline from the pumping station. Number of persons connected to the sewerage system 172 + 60. In addition, a water reserve will be built for a water treatment facility located in the village of Krępa Water Treatment (SUW) — water treatment, construction...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2909:29, 9 March 2020DG Regio talk contribs 12,798 bytes +2,288 Created claim: summary (P836): The task consists of the construction of a sewage system in m. The planned scope of the works includes the execution of a gravity sewerage including the domestic connection and the discharge pipeline from the pumping station. Number of persons connected to the sewerage system 172 + 60. In addition, a water reserve will be built for a water treatment facility located in the village of Krępa Water Treatment (SUW) — water treatment, construction wo...

24 February 2020

18 February 2020

31 January 2020

14 January 2020