Revision history of "Reconstruction and construction of sanitary sewage system in the town of Werbkowice str. Parkowa, Industrial" (Q105644)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 03:5003:50, 11 October 2024DG Regio talk contribs 86,342 bytes +28 Changed label, description and/or aliases in pt
  • curprev 03:5003:50, 11 October 2024DG Regio talk contribs 86,314 bytes +33 Set a claim value: summary (P836): O principal objetivo do projeto é organizar o sistema de descarga de esgotos sanitários da propriedade em Werbkowice. Os resultados descritos na secção 3.3.Objetivo geral: residentes/proprietários da propriedade em ul.Parkowa,Piłsudskiego,Szkolna, Przemysłowa. O projecto é compatível com MPZP m.Werbkowice. O projeto inclui a construção e reconstrução de esgotos sanitários na cidade de Werbkowice com um comprimento total. 1177,5 m no intervalo:1.Reco...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1719:17, 2 March 2023DG Regio talk contribs 83,107 bytes −756 Changed label, description and/or aliases in lv, sk, it, da, ga, el, et, fr, lt, fi, nl, bg, ro, pt, cs, sv, hr, hu, es, sl, de, mt, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 13:1013:10, 2 July 2022DG Regio talk contribs 81,743 bytes +52,972 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:5809:58, 1 December 2021DG Regio talk contribs 16,974 bytes +2,878 Created claim: summary (P836): L’objectif principal du projet est d’organiser le système de drainage des eaux usées sanitaires des locaux de Werbkowice. Résultats décrits à la section 3.3.Gr.docelowa:mieszkańcy/właściciele propriété ul.Parkowa,Pilsudskiego,Szkolna,Industrial. Le projet est compatible avec MPZP m.Werbkowice. Le projet comprend la construction et la reconstruction d’un réseau d’assainissement à Werbkowice d’une longueur totale. 1 177,5 m dans le réseau d’assain...
  • curprev 09:5809:58, 1 December 2021DG Regio talk contribs 14,096 bytes +173 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:4416:44, 17 October 2020DG Regio talk contribs 14,362 bytes +168 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4416:44, 17 October 2020DG Regio talk contribs 14,194 bytes −152 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4416:44, 17 October 2020DG Regio talk contribs 14,346 bytes +2,719 Created claim: summary (P836): The main objective of the project is to organise the sanitary sewage discharge system from the property in Werbkowice. The results described in section 3.3.Gr. target: residents/owners of the property at ul.Parkowa,Piłsudskiego,Szkolna, Przemysłowa. The project is compatible with MPZP m.Werbkowice. The project includes the construction and reconstruction of sanitary sewage in the town of Werbkowice with a total length. 1177.5 m in the range:1.Re...
  • curprev 16:4416:44, 17 October 2020DG Regio talk contribs 11,627 bytes −2,346 Removed claim: summary (P836): The main purpose of the project is to structure the sewage disposal system for the sanitary sewage system from the sew session. The results described in section 3.3.docelowa:mieszkańcy/właściciele of the session at ul. Parkowa, Piłsudskiego, Scotland, Industry, Industry. The project is in line with the MPZP m.Verbkowcevalue. The project consists of the construction and construction of a sanitary sewerage system in m. Verbkowice, with a total l...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2909:29, 9 March 2020DG Regio talk contribs 12,691 bytes +2,346 Created claim: summary (P836): The main purpose of the project is to structure the sewage disposal system for the sanitary sewage system from the sew session. The results described in section 3.3.docelowa:mieszkańcy/właściciele of the session at ul. Parkowa, Piłsudskiego, Scotland, Industry, Industry. The project is in line with the MPZP m.Verbkowcevalue. The project consists of the construction and construction of a sanitary sewerage system in m. Verbkowice, with a total len...

24 February 2020

18 February 2020

31 January 2020

14 January 2020