Revision history of "Construction of sewage system in Rzeczyce" (Q105637)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:0018:00, 9 October 2024DG Regio talk contribs 85,164 bytes −11 Changed label, description and/or aliases in pt
  • curprev 18:0018:00, 9 October 2024DG Regio talk contribs 85,175 bytes +61 Set a claim value: summary (P836): O projeto inclui a construção de uma rede de prensagem com um comprimento de cerca de 3156 m, juntamente com uma estação de bombagem de águas residuais principal e 60 estações de bombagem domésticas. A tarefa da estação de bombagem principal consiste em recolher as águas residuais dos tubos sob pressão a granel e gravá-las no poço de expansão – o recetor de águas residuais em m. Sokołówka. Há também 60 projetos para conexões de esgotos a edifícios....

23 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

26 October 2022

21 October 2022

2 July 2022

  • curprev 13:1013:10, 2 July 2022DG Regio talk contribs 79,554 bytes +51,558 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:5809:58, 1 December 2021DG Regio talk contribs 16,657 bytes +2,839 Created claim: summary (P836): Le projet implique la construction d’un réseau de presse d’une longueur d’env. 3 156 m avec 1 station principale de pompage des eaux usées et 60 stations de pompage de la cour arrière. La principale station de pompage est de collecter les eaux usées des conduites sous pression collectives et de les emboser dans un puits d’expansion — un récepteur d’eaux usées à Sokołówka. 60 raccordements d’égouts aux bâtiments sont également conçus. Le réseau d...
  • curprev 09:5809:58, 1 December 2021DG Regio talk contribs 13,818 bytes +129 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:4416:44, 17 October 2020DG Regio talk contribs 14,128 bytes +100 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4416:44, 17 October 2020DG Regio talk contribs 14,028 bytes −144 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4416:44, 17 October 2020DG Regio talk contribs 14,172 bytes +2,573 Created claim: summary (P836): The project includes the construction of a pressing network with a length of approx. 3156 m along with 1 main sewage pumping station and 60 home pumping stations. The task of the main pumping plant is to collect sewage from the bulk pressure pipes and emboss them into the expansion well – the sewage receiver in m. Sokołówka. There are also 60 designs for sewage connections to buildings. The sewage network will be run for the most part in the bel...
  • curprev 16:4416:44, 17 October 2020DG Regio talk contribs 11,599 bytes −2,075 Removed claim: summary (P836): The planned investment involves the execution of a piston network of around length. 3 156 m with the 1 main pumping station and 60 backyard pumping stations. The main pumping station is to collect the waste water from the bulk pipes and to press them into the expansion well — the receiver of the waste water in m. There are also 60 sewage connections to buildings. The sewerage network will be carried out in most parts of the area of the existin...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2909:29, 9 March 2020DG Regio talk contribs 12,391 bytes +2,075 Created claim: summary (P836): The planned investment involves the execution of a piston network of around length. 3 156 m with the 1 main pumping station and 60 backyard pumping stations. The main pumping station is to collect the waste water from the bulk pipes and to press them into the expansion well — the receiver of the waste water in m. There are also 60 sewage connections to buildings. The sewerage network will be carried out in most parts of the area of the existing...

24 February 2020

18 February 2020

31 January 2020

14 January 2020