Revision history of "Construction of sanitary sewage system in Wola Różaniecka – stage III" (Q105599)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1719:17, 2 March 2023DG Regio talk contribs 87,897 bytes −66 Changed label, description and/or aliases in it, lv, da, sk, et, bg, fi, fr, hu, es, ro, hr, sl, ga, pt, sv, cs, el, lt, de, mt, and other parts

26 October 2022

21 October 2022

27 July 2022

  • curprev 11:3111:31, 27 July 2022DG Regio talk contribs 85,851 bytes +56,040 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:5709:57, 1 December 2021DG Regio talk contribs 17,403 bytes +3,093 Created claim: summary (P836): La phase III d’assainissement sanitaire prévue sera réalisée dans le village Wola Różaniecka dans la zone des bâtiments agricoles située le long de la route de district no 2958L Wola Różaniecka-Rróaniec. Longueur totale des égouts 3 ETAPU — L = 10 414 m, y compris les conduits sanitaires par gravité des conduites en polyéthylène PEHD SN 8 de diamètre 150-200 mm avec une longueur totale L = 5 371 m; Raccords d’égouts à partir de tuyaux en polyéth...
  • curprev 09:5709:57, 1 December 2021DG Regio talk contribs 14,310 bytes +152 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:4316:43, 17 October 2020DG Regio talk contribs 14,597 bytes +132 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4316:43, 17 October 2020DG Regio talk contribs 14,465 bytes −136 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4316:43, 17 October 2020DG Regio talk contribs 14,601 bytes +2,791 Created claim: summary (P836): The planned sanitary sewerage stage III will be implemented in the village of Wola Różaniecka in the area of the farmhouse located along the district road No. 2958L Wola Różaniecka-Różaniec. Total length of sewage system 3 ETAPU – L = 10414 m including gravitational sanitary ducts made of PEHD SN 8 polyethylene pipes with diameters 150-200 mm with a total length L = 5371 m; PEHD SN 8 polyethylene pipe connections with diameters 150-200 mm with a...
  • curprev 16:4316:43, 17 October 2020DG Regio talk contribs 11,810 bytes −2,313 Removed claim: summary (P836): The design of the sanitary sewerage phase III will be carried out in the area of the village of Wola. Total sewage length of 3 ETAPU — L = 10 414 m including gravity sanitary sewers with polyethylene PEHD SN 8 with diameters 150-200 mm with a total length of L = 5 371 m; Sewerage connections with polyethylene PEHD SN 8 with a diameter of 150-200 mm with an overall length of L = 3 497 m; Discharge pipes from EP (HD) pipes with a total length of...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2909:29, 9 March 2020DG Regio talk contribs 12,846 bytes +2,313 Created claim: summary (P836): The design of the sanitary sewerage phase III will be carried out in the area of the village of Wola. Total sewage length of 3 ETAPU — L = 10 414 m including gravity sanitary sewers with polyethylene PEHD SN 8 with diameters 150-200 mm with a total length of L = 5 371 m; Sewerage connections with polyethylene PEHD SN 8 with a diameter of 150-200 mm with an overall length of L = 3 497 m; Discharge pipes from EP (HD) pipes with a total length of L...

24 February 2020

18 February 2020

31 January 2020

14 January 2020