Revision history of "Construction of sanitary sewage system with sewage pumping stations and sewage pipes for Wola Burzecka" (Q105596)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 15:5715:57, 10 October 2024DG Regio talk contribs 61,010 bytes −6 Changed label, description and/or aliases in pt
  • curprev 15:5715:57, 10 October 2024DG Regio talk contribs 61,016 bytes −13 Set a claim value: summary (P836): Como resultado deste projeto, foram construídos os seguintes: — Rede de drenagem por gravidade o200-2038 mb — Rede de esgotos por gravidade de 160-1320 mb (no âmbito das despesas inelegíveis) — Condutor de pressão (pressão) de 110-120 mb — Condutor de pressão (pressão) de 90-328 m — canais de 160-176 mb — estação de bombagem de águas residuais — 2 pc. No âmbito do projeto, foram realizados um total de 2486 mb de saneamento (esgotos por pressão e gra...

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1719:17, 2 March 2023DG Regio talk contribs 57,855 bytes +537 Changed label, description and/or aliases in sk, da, it, fi, sv, ga, cs, sl, pt, lv, hu, el, fr, ro, hr, nl, et, es, lt, de, bg, mt, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 13:0913:09, 2 July 2022DG Regio talk contribs 55,207 bytes +34,317 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:5709:57, 1 December 2021DG Regio talk contribs 13,715 bytes +1,707 Created claim: summary (P836): À la suite de la mise en œuvre de ce projet: — Réseau d’égouts par gravité d’environ 200-2038 mb — Réseau d’assainissement gravitaire de 160-1320 mb (dépense non admissible) — Tube sous pression (pression) de 110-120 mb — Tuyau de pression (pression) de 90-328 mb — canaux de 160-176 mb — Stations de pompage des eaux usées — 2 pièces. Dans le cadre du projet, un total de 2486 mb d’égouts sanitaires (presse et gravitationnel) et 176 mb d’égouts on...
  • curprev 09:5709:57, 1 December 2021DG Regio talk contribs 12,008 bytes +178 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:4316:43, 17 October 2020DG Regio talk contribs 12,269 bytes +162 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4316:43, 17 October 2020DG Regio talk contribs 12,107 bytes −163 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4316:43, 17 October 2020DG Regio talk contribs 12,270 bytes +1,621 Created claim: summary (P836): As a result of this project, the following were built: — Gravity drainage network o200-2038 mb – Gravity sewerage network of 160-1320 mb (in the scope of ineligible expenditure) – Pressure (pressure) conductor of 110-120 mb – Pressure (pressure) conductor of 90-328 m – canals of 160-176 mb – sewage pumping plant – 2 pc. As part of the project, a total of 2486 mb sanitary (pressure and gravity sewerage) and 176 mb sanitary drainage were carried o...
  • curprev 16:4316:43, 17 October 2020DG Regio talk contribs 10,649 bytes −1,107 Removed claim: summary (P836): As a result of the implementation of this project: — gravity sewer network for 200-2038 mb — gravity mains network by 160-1320 mb (for non eligible expenditure) — Piston discharge (pressurised) 110-120 mb — Piston discharge (pressurised) by 90-328 mb — sewer systems with 160-176 mb — sewage pump — 2 units. The project has consisted of a total of 2486 mb sanitary (pressing and gravity) sewers and 176 mb (sewers not eligible for the same sector)...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2909:29, 9 March 2020DG Regio talk contribs 10,476 bytes +1,107 Created claim: summary (P836): As a result of the implementation of this project: — gravity sewer network for 200-2038 mb — gravity mains network by 160-1320 mb (for non eligible expenditure) — Piston discharge (pressurised) 110-120 mb — Piston discharge (pressurised) by 90-328 mb — sewer systems with 160-176 mb — sewage pump — 2 units. The project has consisted of a total of 2486 mb sanitary (pressing and gravity) sewers and 176 mb (sewers not eligible for the same sector)....

24 February 2020

18 February 2020

31 January 2020

14 January 2020