Revision history of "Modernisation of water management in the municipality of Rybczewice through the construction of a reservoir of liquid water from decarboniser filters, installation of RES system and installations monitoring the operation of water intakes" (Q105576)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1719:17, 2 March 2023DG Regio talk contribs 93,325 bytes +484 Changed label, description and/or aliases in da, it, sk, ga, lv, sv, cs, es, lt, de, et, fi, ro, bg, el, hr, mt, nl, fr, pt, hu, sl, and other parts

26 October 2022

21 October 2022

27 July 2022

  • curprev 11:3111:31, 27 July 2022DG Regio talk contribs 90,738 bytes +59,175 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

20 May 2022

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:5309:53, 1 December 2021DG Regio talk contribs 17,952 bytes +3,251 Created claim: summary (P836): Le projet comprend la construction d’un réservoir d’infiltration et d’évaporation pour le lavage de l’eau de rinçage du fer et permettant leur gestion dans la zone du terrain de captage de l’eau. Comme volume de la citerne, un volume semestriel d’eaux usées provenant des lavages de 110,5 m³ a été utilisé. La surface du réservoir absorbant et drainant l’eau est de 111 m². Le réservoir a été conçu sur l’approvisionnement en eau existant Pilaszkowi...
  • curprev 09:5309:53, 1 December 2021DG Regio talk contribs 14,701 bytes +310 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:4216:42, 17 October 2020DG Regio talk contribs 14,830 bytes +297 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4216:42, 17 October 2020DG Regio talk contribs 14,533 bytes −310 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4216:42, 17 October 2020DG Regio talk contribs 14,843 bytes +2,748 Created claim: summary (P836): The project involves the construction of an infiltrating and evaporating tank on the flushing of deferailisers and enabling them to be managed in the area of the water intake plot. As the volume of the tank was taken a half-year capacity of the amount of sewage with washes of 110.5 m³. The surface of the water mirror of the absorbing and dispensing tank is 111 m². The tank was designed on the existing water catchment of Pilaszkowice – Bazar on p...
  • curprev 16:4216:42, 17 October 2020DG Regio talk contribs 12,095 bytes −2,308 Removed claim: summary (P836): The project involves the installation of an infiltrating reservoir into the water from the rinsing of the degression in the water and enabling it to be managed in the area of the water extraction plot. As the tank volume, half an annual volume of 110.5 m³ of sewage is used. The surface of the water body of the absorption tank shall be 111 m². The tank has been designed on the existing water of Pilaszkowice — Bazar on plot 254/2. In addition, i...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2909:29, 9 March 2020DG Regio talk contribs 13,120 bytes +2,308 Created claim: summary (P836): The project involves the installation of an infiltrating reservoir into the water from the rinsing of the degression in the water and enabling it to be managed in the area of the water extraction plot. As the tank volume, half an annual volume of 110.5 m³ of sewage is used. The surface of the water body of the absorption tank shall be 111 m². The tank has been designed on the existing water of Pilaszkowice — Bazar on plot 254/2. In addition, it...

24 February 2020

18 February 2020

31 January 2020

14 January 2020