Revision history of "Thermal modernisation of primary school No. 2 in Łęczna" (Q105387)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:1515:15, 7 October 2024DG Regio talk contribs 88,916 bytes +3 Changed label, description and/or aliases in pt
  • curprev 15:1515:15, 7 October 2024DG Regio talk contribs 88,913 bytes −9 Set a claim value: summary (P836): O objetivo geral do projeto diz respeito a uma modernização energética profunda e abrangente do edifício da Escola Primária n.o 2 em Łęczna através de ações destinadas a aumentar a eficiência energética do serviço de utilidade pública – dedilhação educativa. Os principais objetivos do projeto são os seguintes: —menor consumo de energia durante a estação de aquecimento devido à falta de isolamento adequado e ao aquecimento do edifício escolar; —reduç...

7 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

26 October 2022

21 October 2022

2 July 2022

  • curprev 13:0513:05, 2 July 2022DG Regio talk contribs 83,341 bytes +53,877 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:3709:37, 1 December 2021DG Regio talk contribs 17,246 bytes +3,077 Created claim: summary (P836): L’objectif général du projet est de moderniser en profondeur et en profondeur la construction de l’école primaire no 2 à Łęczna grâce à la mise en œuvre de mesures visant à accroître l’efficacité énergétique de l’installation d’utilité publique — pédagogie. Les principaux objectifs du projet sont les suivants: —diminuer le niveau de consommation d’énergie pendant la saison de chauffage, en raison du manque d’isolation et de réchauffement adéquat...
  • curprev 09:3709:37, 1 December 2021DG Regio talk contribs 14,169 bytes +118 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 08:5908:59, 20 October 2020DG Regio talk contribs 14,492 bytes +118 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:5908:59, 20 October 2020DG Regio talk contribs 14,374 bytes −103 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 08:5908:59, 20 October 2020DG Regio talk contribs 14,477 bytes +2,749 Created claim: summary (P836): The general objective of the project concerns a deep, comprehensive energy modernisation of the Elementary School No. 2 building in Łęczna through actions aimed at increasing the energy efficiency of the public utility facility – educational fingering. The main objectives of the project are to: —lower energy consumption during the heating season due to lack of adequate insulation and warming of the school building; —reducing heat consumption for...
  • curprev 08:5908:59, 20 October 2020DG Regio talk contribs 11,728 bytes −2,270 Removed claim: summary (P836): The general objective of the project is to achieve a deep and comprehensive energy modernisation of the building of the Primary School No 2 in Łęczny, by implementing measures to increase the energy efficiency of a public utility — an education burner. The main objectives of the project are to: A reduction in the level of energy consumption in the heating season due to the lack of adequate insulation and warming of the school building; Reduce...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 10:1510:15, 6 March 2020DG Regio talk contribs 12,714 bytes +2,270 Created claim: summary (P836): The general objective of the project is to achieve a deep and comprehensive energy modernisation of the building of the Primary School No 2 in Łęczny, by implementing measures to increase the energy efficiency of a public utility — an education burner. The main objectives of the project are to: A reduction in the level of energy consumption in the heating season due to the lack of adequate insulation and warming of the school building; Reduce he...

24 February 2020

18 February 2020

31 January 2020

14 January 2020