Revision history of "Thermal modernisation of public buildings in Białopole commune" (Q105278)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:1406:14, 9 October 2024DG Regio talk contribs 92,443 bytes +5 Changed label, description and/or aliases in pt
  • curprev 06:1406:14, 9 October 2024DG Regio talk contribs 92,438 bytes +25 Set a claim value: summary (P836): O projecto consiste na construção de broto térmico. UG Białopole, ul. Chełmska 1, dz.315/4 de 0001, onde se espera que o aquecimento central seja trocado, instalação de uma caldeira para pellets, aquecimento de tetos, paredes externas e substituição da carpintaria externa. No edifício SP em Strzelka, Sagitário 43B, dz.447a área 0010, incluindo troca de painel solar sistema de aquecimento externo, caldeira para pellets e paredes interiores aquecidas....

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

26 October 2022

21 October 2022

2 July 2022

  • curprev 13:0213:02, 2 July 2022DG Regio talk contribs 88,812 bytes +57,813 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:3509:35, 1 December 2021DG Regio talk contribs 17,924 bytes +3,429 Created claim: summary (P836): Le projet consiste en l’exécution de bourgeons thermiques. UG Białopole, ul Chełmska 1, dz.315/4 surface 0001, où il est envisagé de remplacer le système de chauffage central, d’assembler une chaudière à granulés, de réchauffer les toitures, les murs extérieurs et de remplacer la menuiserie extérieure. Dans le bâtiment SP à Strzelka, Strzelce 43B, dz.447 zone 0010, y compris le remplacement du panneau solaire extérieur du système de chauffage ce...
  • curprev 09:3509:35, 1 December 2021DG Regio talk contribs 14,495 bytes +137 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 08:5608:56, 20 October 2020DG Regio talk contribs 14,799 bytes +124 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:5608:56, 20 October 2020DG Regio talk contribs 14,675 bytes −123 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 08:5608:56, 20 October 2020DG Regio talk contribs 14,798 bytes +3,039 Created claim: summary (P836): The project consists of the construction of thermal. bud. UG Białopole, ul. Chełmska 1, dz.315/4 of 0001, where central heating is expected to be exchanged, installation of a boiler for pellets, warming of ceilings, external walls and replacement of the outer carpentry. In the building SP in Strzelka, Sagittarius 43B, dz.447th area 0010, including exchange of solar panel external heating system, boiler for pellets and warmed interior walls. atti...
  • curprev 08:5608:56, 20 October 2020DG Regio talk contribs 11,759 bytes −2,304 Removed claim: summary (P836): The project consists of a budget. White tyres, ul. Chełmska 1, dz.315/4, area 0001, where c.o is expected to be replaced, fitting of a boiler to pellet, insulation of the roof, external walls and replacement of ext. In the SP building in Strzelce, Strzelce 43B, j.447, point 0010, the replacement of solar energy. In Busko, Buśno 44 dz. 629 of the 0002th rim, the installation of a c.o. fittings and doors for doors, the installation of a boiler f...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 10:0910:09, 6 March 2020DG Regio talk contribs 12,782 bytes +2,304 Created claim: summary (P836): The project consists of a budget. White tyres, ul. Chełmska 1, dz.315/4, area 0001, where c.o is expected to be replaced, fitting of a boiler to pellet, insulation of the roof, external walls and replacement of ext. In the SP building in Strzelce, Strzelce 43B, j.447, point 0010, the replacement of solar energy. In Busko, Buśno 44 dz. 629 of the 0002th rim, the installation of a c.o. fittings and doors for doors, the installation of a boiler for...

24 February 2020

18 February 2020

31 January 2020

14 January 2020