Revision history of "Thermal modernisation of the commercial and service building with the installation of a photovoltaic installation." (Q105224)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 03:5003:50, 11 October 2024DG Regio talk contribs 91,586 bytes −7 Changed label, description and/or aliases in pt
  • curprev 03:5003:50, 11 October 2024DG Regio talk contribs 91,593 bytes −31 Set a claim value: summary (P836): No âmbito do projeto, a recorrente planeou a modernização do edifício comercial e de serviços, bem como a instalação de microinstalações fotovoltaicas. Com base na auditoria energética desenvolvida, será implementada a escolha da melhor opção tecnológica no âmbito do projeto, nomeadamente: modernização do sistema de aquecimento central, modernização da iluminação, substituição da marcenaria de aço e madeira para janelas, substituição da marcenaria p...

7 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1619:16, 2 March 2023DG Regio talk contribs 89,227 bytes +71 Changed label, description and/or aliases in lv, it, da, sk, sv, sl, fi, hr, ga, ro, de, lt, et, bg, pt, hu, nl, es, mt, el, cs, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 11:2711:27, 27 July 2022DG Regio talk contribs 87,044 bytes +56,085 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:3509:35, 1 December 2021DG Regio talk contribs 17,777 bytes +3,308 Created claim: summary (P836): Dans le cadre du projet, la requérante a planifié la thermomodernisation du bâtiment commercial et du bâtiment de service ainsi que l’installation d’une installation microvoltaïque. Sur la base de la sélection de l’option technologique optimale dans le cadre du projet résultant de l’audit énergétique développé, le projet sera mis en œuvre, entre autres: modernisation des installations de chauffage central, modernisation de l’éclairage, remplacem...
  • curprev 09:3509:35, 1 December 2021DG Regio talk contribs 14,469 bytes +177 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 08:5508:55, 20 October 2020DG Regio talk contribs 14,733 bytes +176 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:5508:55, 20 October 2020DG Regio talk contribs 14,557 bytes −158 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 08:5508:55, 20 October 2020DG Regio talk contribs 14,715 bytes +2,840 Created claim: summary (P836): As part of the project, the applicant planned the modernisation of the commercial and service building together with the installation of micro photovoltaic installations. Based on the developed energy audit, the choice of the optimal technological option within the project will be implemented, inter alia: modernisation of central heating system, modernisation of lighting, replacement of steel and wooden window joinery, replacement of door joiner...
  • curprev 08:5508:55, 20 October 2020DG Regio talk contribs 11,875 bytes −2,320 Removed claim: summary (P836): As part of the project, the applicant has planned thermal modernisation of the commercial and services building with the installation of micro-photovoltaic equipment. Based on the resulting energy audit, the selection of the optimal technological option within the project will be achieved, inter alia: modernisation of the heating system, modernisation of lighting, replacement of steel and wooden window frames, replacement of door frames, repla...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 10:1310:13, 6 March 2020DG Regio talk contribs 12,912 bytes +2,320 Created claim: summary (P836): As part of the project, the applicant has planned thermal modernisation of the commercial and services building with the installation of micro-photovoltaic equipment. Based on the resulting energy audit, the selection of the optimal technological option within the project will be achieved, inter alia: modernisation of the heating system, modernisation of lighting, replacement of steel and wooden window frames, replacement of door frames, replace...

24 February 2020

18 February 2020

31 January 2020

14 January 2020