Revision history of "Improving the energy efficiency of the service building in Bełżec" (Q105070)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 03:5003:50, 11 October 2024DG Regio talk contribs 74,974 bytes −80 Set a claim value: summary (P836): Melhorar a eficiência energética do edifício de serviços em Bełżec inclui: 1.Thermomodernisation das peças do telhado. O aquecimento do teto com uma área de 238,62 m2 está previsto a partir de painéis sanduíche com um núcleo de espuma PIR ou PUR. 2.Substituir uma porta de 120,8 m2 3.Intercâmbio de janelas e luxferes com uma área de 54,8 m2 4.Substituir a fonte de calor existente da caldeira a carvão em caldeira a biomassa com a modernização do siste...

23 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 11:2611:26, 27 July 2022DG Regio talk contribs 68,868 bytes +43,542 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:2809:28, 1 December 2021DG Regio talk contribs 15,418 bytes +2,447 Created claim: summary (P836): L’amélioration de l’efficacité énergétique du bâtiment de services à Bełżec comprend: 1.Termomodernisation des pièces de toit. Un réchauffement de 238,62 m² est prévu pour être fait de panneaux sandwich avec noyau en mousse PIR ou PUR. 2.Remplacement des portes d’une surface de 120,8 m² 3.Remplacement des fenêtres et des pièces lux d’une surface de 54,8 m² 4.Remplacement de la source de chaleur existante de la chaudière au charbon par une chaudi...
  • curprev 09:2809:28, 1 December 2021DG Regio talk contribs 12,971 bytes +142 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 17:5017:50, 17 October 2020DG Regio talk contribs 13,268 bytes +126 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:5017:50, 17 October 2020DG Regio talk contribs 13,142 bytes −120 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:5017:50, 17 October 2020DG Regio talk contribs 13,262 bytes +2,165 Created claim: summary (P836): Improving the energy efficiency of the service building in Bełżec includes: 1.Thermomodernisation of roof parts. Warming of the ceiling with an area of 238.62 m² is planned from sandwich panels with a core of PIR or PUR foam. 2.Replace a door of 120.8 m² 3.Exchange of windows and luxpheres with an area of 54.8 m² 4.Replace the existing heat source of coal boiler into biomass boiler with the modernisation of the central heating system with the us...
  • curprev 17:5017:50, 17 October 2020DG Regio talk contribs 11,097 bytes −1,779 Removed claim: summary (P836): The improvement of the energy efficiency of the Bełžowe building includes: 1.Thermal modernisation of the roof. A surface warming of 238.62 m² is planned. it is planned to perform a layer of sandwich panels with PIR or PUR foam. 2.Change in a surface of 120.8 m² 3. replacement of windows and windows with a surface area of 54.8 m² 4.variation of the existing source of heat from a coal boiler to a biomass boiler together with a modernisation of...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 09:5709:57, 6 March 2020DG Regio talk contribs 11,586 bytes +1,779 Created claim: summary (P836): The improvement of the energy efficiency of the Bełžowe building includes: 1.Thermal modernisation of the roof. A surface warming of 238.62 m² is planned. it is planned to perform a layer of sandwich panels with PIR or PUR foam. 2.Change in a surface of 120.8 m² 3. replacement of windows and windows with a surface area of 54.8 m² 4.variation of the existing source of heat from a coal boiler to a biomass boiler together with a modernisation of th...

24 February 2020

18 February 2020

31 January 2020

14 January 2020