Revision history of "Production of electricity from RES in the company Arkadiusz Kończyński – MIX" (Q105027)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 15:5815:58, 10 October 2024DG Regio talk contribs 75,245 bytes 0 Changed label, description and/or aliases in pt
  • curprev 15:5815:58, 10 October 2024DG Regio talk contribs 75,245 bytes +40 Set a claim value: summary (P836): O projeto tem por objeto a construção de uma exploração fotovoltaica em Sitaniec Błonie, no distrito de Zamość, o município da aldeia de Zamość. A eletricidade produzida pela exploração – cerca de 103,05 MWh – será concebida para satisfazer as necessidades próprias do requerente e a produção excedentária será transferida para a rede elétrica local. A instalação projetada será montada em armações feitas de perfis ce e perfis de chapéu num sistema ind...

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1619:16, 2 March 2023DG Regio talk contribs 72,809 bytes −599 Changed label, description and/or aliases in da, lv, it, sk, sl, pt, fi, sv, ro, et, hu, de, fr, bg, hr, el, mt, lt, nl, cs, es, ga, and other parts

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 12:5712:57, 2 July 2022DG Regio talk contribs 71,290 bytes +45,662 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:2609:26, 1 December 2021DG Regio talk contribs 15,651 bytes +2,460 Created claim: summary (P836): L’objet du projet est la construction d’une ferme photovoltaïque à Sitaniec Błonie dans le comté de Zamość, une commune rurale de Zamość. Électricité produite par la ferme — env. 103,05 MWh — sera utilisé pour répondre aux propres besoins du demandeur et la production excédentaire sera transférée au réseau électrique local. L’installation conçue sera montée sur des cadres constitués de profilés d’enveloppe et de profilés de chapeau dans un systè...
  • curprev 09:2609:26, 1 December 2021DG Regio talk contribs 13,191 bytes +138 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 17:3417:34, 17 October 2020DG Regio talk contribs 13,492 bytes +139 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:3417:34, 17 October 2020DG Regio talk contribs 13,353 bytes −123 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:3417:34, 17 October 2020DG Regio talk contribs 13,476 bytes +2,256 Created claim: summary (P836): The subject of the project is the construction of a photovoltaic farm in Sitaniec Błonie in Zamość County, the village municipality Zamość. Electricity generated by the farm – approx. 103,05 MWh – will be designed to meet the applicant’s own needs and surplus production will be transferred to the local power grid. The designed installation will be mounted on frames made of ce-profiles and hat profiles in a freestanding system. The plot area will...
  • curprev 17:3417:34, 17 October 2020DG Regio talk contribs 11,220 bytes −1,748 Removed claim: summary (P836): The object of the project is the construction of a photovoltaic farm in the town of Sitaiec situated in the town of town of Zamora, the municipality of Zamość. Electricity produced by the farm — ca. 103.05 MWh will be used to meet the applicant’s own needs and the excess production will be transferred to the local energy network. The design of the installation will be mounted on the steppe of the coil profiles and on the block frames in the fr...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:1309:13, 9 March 2020DG Regio talk contribs 11,679 bytes +1,748 Created claim: summary (P836): The object of the project is the construction of a photovoltaic farm in the town of Sitaiec situated in the town of town of Zamora, the municipality of Zamość. Electricity produced by the farm — ca. 103.05 MWh will be used to meet the applicant’s own needs and the excess production will be transferred to the local energy network. The design of the installation will be mounted on the steppe of the coil profiles and on the block frames in the free...

24 February 2020

18 February 2020

31 January 2020

14 January 2020