Revision history of "Photovoltaics – a step towards energy self-sufficiency" (Q105003)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:1215:12, 7 October 2024DG Regio talk contribs 59,900 bytes +8 Changed label, description and/or aliases in pt
  • curprev 15:1215:12, 7 October 2024DG Regio talk contribs 59,892 bytes −2 Set a claim value: summary (P836): O projeto consistirá na construção de uma instalação fotovoltaica com uma capacidade de 35 kW com utilização exclusiva da energia produzida para consumo próprio. O projeto será executado no período compreendido entre 1.3.2018 e 31.5.2018. O resultado do projeto será a instalação de uma capacidade adicional de produção de eletricidade a partir de fontes renováveis de 0,0350 MW, 1 a empresa receberá apoio para a construção de unidades de produção de e...

23 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 11:2511:25, 27 July 2022DG Regio talk contribs 55,341 bytes +34,046 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:2609:26, 1 December 2021DG Regio talk contribs 13,772 bytes +1,782 Created claim: summary (P836): La mise en œuvre du projet consistera en la construction d’une installation photovoltaïque de 35 kW utilisant exclusivement l’énergie produite pour son propre usage. Le projet sera mis en œuvre au cours de la période allant du 01.03.2018 au 31.05.2018. Le projet aboutira à l’installation d’une capacité supplémentaire de production d’électricité renouvelable de 0,0350 MW, une entreprise bénéficiera d’un soutien pour la construction d’unités de pr...
  • curprev 09:2609:26, 1 December 2021DG Regio talk contribs 11,990 bytes +126 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 17:3417:34, 17 October 2020DG Regio talk contribs 12,303 bytes +115 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:3417:34, 17 October 2020DG Regio talk contribs 12,188 bytes −115 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:3417:34, 17 October 2020DG Regio talk contribs 12,303 bytes +1,700 Created claim: summary (P836): The project will consist of the construction of a photovoltaic installation with a capacity of 35 kW with the exclusive use of the produced energy for own use. The project will be implemented in the period from 01.03.2018 to 31.05.2018. The result of the project will be the installation of additional renewable electricity generation capacity of 0.0350 MW, 1 the company will receive support for the construction of electricity generation units fro...
  • curprev 17:3417:34, 17 October 2020DG Regio talk contribs 10,603 bytes −1,106 Removed claim: summary (P836): The project will consist of the construction of a 35 kW photovoltaic power plant with the exclusive use of produced energy for its own use. The project will run from 01.03.2018 to 31.05.2018. the project will install additional renewable electricity generating capacity of 0.0350 MW, 1 company will be supported for the construction of units producing electricity from RES. With the project, the Applicant will contract a worker to operate the min...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:1209:12, 9 March 2020DG Regio talk contribs 10,437 bytes +1,106 Created claim: summary (P836): The project will consist of the construction of a 35 kW photovoltaic power plant with the exclusive use of produced energy for its own use. The project will run from 01.03.2018 to 31.05.2018. the project will install additional renewable electricity generating capacity of 0.0350 MW, 1 company will be supported for the construction of units producing electricity from RES. With the project, the Applicant will contract a worker to operate the mini...

24 February 2020

18 February 2020

31 January 2020

14 January 2020