Revision history of "Construction of 4 photovoltaic installations with a total capacity of 192.92 kWp for energy diversification of the Municipal Services Company in Radzyń Podlaski" (Q104997)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 15:5815:58, 10 October 2024DG Regio talk contribs 89,334 bytes −10 Changed label, description and/or aliases in pt
  • curprev 15:5815:58, 10 October 2024DG Regio talk contribs 89,344 bytes +14 Set a claim value: summary (P836): O investimento previsto é fixo e consistirá na construção de 4 instalações fotovoltaicas de produção de eletricidade solar com uma capacidade total de 192,92 kW. Todo o projeto PUK sp. z o.o. em Radzyń Podlaski consiste nas seguintes instalações: 1. Instalação fotovoltaica com uma potência de 33,6 kWp – HEAD FIMES Construção de uma instalação fotovoltaica com uma potência-alvo de 33,6 kWp plantada no telhado de edifícios. Foram utilizados módulos fo...

22 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1619:16, 2 March 2023DG Regio talk contribs 86,933 bytes −574 Changed label, description and/or aliases in da, lv, it, bg, fi, sk, pt, hr, de, cs, fr, mt, el, nl, et, sv, hu, ro, lt, sl, es, ga, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 11:2511:25, 27 July 2022DG Regio talk contribs 85,393 bytes +55,328 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:2609:26, 1 December 2021DG Regio talk contribs 17,630 bytes +3,068 Created claim: summary (P836): L’investissement prévu est stationnaire et consistera en la construction de 4 installations solaires photovoltaïques d’une capacité totale de 192,92 kW. L’ensemble du projet PUK sp. z o.o. à Radzyń Podlaski comprend les installations suivantes: 1. 33,6 kWp installation photovoltaïque — Firmy Construction d’une installation photovoltaïque avec une puissance cible de 33,6 kWp sur le toit des bâtiments. Des modules photovoltaïques photovoltaïques m...
  • curprev 09:2609:26, 1 December 2021DG Regio talk contribs 14,562 bytes +253 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 17:3317:33, 17 October 2020DG Regio talk contribs 14,748 bytes +221 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:3317:33, 17 October 2020DG Regio talk contribs 14,527 bytes −184 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:3317:33, 17 October 2020DG Regio talk contribs 14,711 bytes +2,742 Created claim: summary (P836): The planned investment is stationary and will consist of the construction of 4 photovoltaic installations producing solar electricity with a total capacity of 192,92 kW. The entire PUK sp. z o.o. project in Radzyń Podlaski consists of the following installations: 1. Photovoltaic installation with a power of 33.6 kWp – HEAD FIMES Construction of a photovoltaic installation with a target power of 33.6 kWp planted on the roof of buildings. PV monoc...
  • curprev 17:3317:33, 17 October 2020DG Regio talk contribs 11,969 bytes −2,197 Removed claim: summary (P836): The investment planned for the implementation of the investment is stationary and will consist of the development of 4 solar photovoltaic installations producing electricity from solar radiation of a total power of 192.92 kW. The following installations are part of the whole PUK sp. z o.o. project: 1. A 33,6 kWp — SIEDZIBA FIRMY PV installation Construction of a photovoltaic installation with a target capacity of 33,6 kWp on the roof of the bu...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:1209:12, 9 March 2020DG Regio talk contribs 12,886 bytes +2,197 Created claim: summary (P836): The investment planned for the implementation of the investment is stationary and will consist of the development of 4 solar photovoltaic installations producing electricity from solar radiation of a total power of 192.92 kW. The following installations are part of the whole PUK sp. z o.o. project: 1. A 33,6 kWp — SIEDZIBA FIRMY PV installation Construction of a photovoltaic installation with a target capacity of 33,6 kWp on the roof of the buil...

24 February 2020

18 February 2020

31 January 2020

14 January 2020