Revision history of "Energy production from RES in the Municipal Economy Department in Szczebrzeszyn" (Q104974)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 18:4418:44, 2 March 2023DG Regio talk contribs 75,642 bytes +1,450 Changed label, description and/or aliases in lv, da, sk, fi, el, pt, fr, ro, hu, lt, sv, ga, hr, de, sl, es, nl, bg, mt, cs, it, and other parts

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 12:5612:56, 2 July 2022DG Regio talk contribs 72,074 bytes +46,068 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:2109:21, 1 December 2021DG Regio talk contribs 15,858 bytes +2,478 Created claim: summary (P836): Le projet consistera en la construction d’une installation photovoltaïque sur un terrain à ul. Gorajska 51 à Szczebrzeszyn. Le système photovoltaïque sera connecté en permanence au réseau électrique. Tout excédent d’électricité produit par des cellules photovoltaïques sera vendu au gestionnaire du réseau électrique. L’installation photovoltaïque consistera en: cellules photovoltaïques polycristallines d’une puissance de 290 Wp — 152 pièces avec...
  • curprev 09:2109:21, 1 December 2021DG Regio talk contribs 13,380 bytes +161 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 17:3317:33, 17 October 2020DG Regio talk contribs 13,658 bytes +138 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:3317:33, 17 October 2020DG Regio talk contribs 13,520 bytes −119 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:3317:33, 17 October 2020DG Regio talk contribs 13,639 bytes +2,245 Created claim: summary (P836): The project will consist of the construction of a photovoltaic installation on a land plot at ul. Gorajska 51 in Szczebrzeszyn. The photovoltaic system will be permanently connected to the power grid. Any excess electricity produced by photovoltaic cells will be resold to the electricity grid manager. The photovoltaic installation will include: polycrystalline photovoltaic cells with a power of 290 Wp – 152 pcs with fittings; three-phase photovo...
  • curprev 17:3317:33, 17 October 2020DG Regio talk contribs 11,394 bytes −1,804 Removed claim: summary (P836): The project will consist of the construction of a photovoltaic installation on a plot of land at ul. Shore side 51, at the heart of the storm. The PV system will be permanently connected to the electricity grid. Any surplus electricity produced by the photocell will be resold to the electricity network manager. The following shall be included in the composition of the photovoltaic installation: 290Wp polycrystalline cells with Wp — 152 cells w...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:1209:12, 9 March 2020DG Regio talk contribs 11,918 bytes +1,804 Created claim: summary (P836): The project will consist of the construction of a photovoltaic installation on a plot of land at ul. Shore side 51, at the heart of the storm. The PV system will be permanently connected to the electricity grid. Any surplus electricity produced by the photocell will be resold to the electricity network manager. The following shall be included in the composition of the photovoltaic installation: 290Wp polycrystalline cells with Wp — 152 cells wit...

24 February 2020

18 February 2020

31 January 2020

14 January 2020