Revision history of "Construction of a photovoltaic installation up to 40 kW for the operation of the inn" (Q104973)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 15:5815:58, 10 October 2024DG Regio talk contribs 73,081 bytes −33 Changed label, description and/or aliases in pt
  • curprev 15:5815:58, 10 October 2024DG Regio talk contribs 73,114 bytes −55 Set a claim value: summary (P836): O principal objetivo do projeto é diversificar o aprovisionamento energético e aumentar a segurança energética da empresa ZACISZE Bożena Struk até 31.12.2018. Objetivos específicos: 1. Diversificação das fontes de energia e criação de condições para a produção de eletricidade a partir de FER a um nível de 40 kW graças à utilização de uma fonte renovável de energia solar 2.Implementação de um sistema inteligente de gestão da energia que minimize as p...

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1619:16, 2 March 2023DG Regio talk contribs 70,772 bytes +1,758 Changed label, description and/or aliases in da, it, sk, lv, hr, fi, ga, el, fr, es, et, sv, pt, hu, ro, lt, de, nl, bg, sl, cs, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 11:2511:25, 27 July 2022DG Regio talk contribs 66,896 bytes +42,129 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:2109:21, 1 December 2021DG Regio talk contribs 15,246 bytes +2,418 Created claim: summary (P836): L’objectif principal du projet est de diversifier l’approvisionnement énergétique et d’accroître la sécurité énergétique de la société Zacisze Bożena Struk d’ici le 31.12.2018. Objectifs spécifiques: 1. Diversification des sources d’énergie et création de conditions de production d’électricité au niveau de 40 kW à partir de sources d’énergie renouvelables grâce à l’utilisation d’une source d’énergie solaire renouvelable 2. Mise en œuvre d’un sys...
  • curprev 09:2109:21, 1 December 2021DG Regio talk contribs 12,828 bytes +164 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 17:3317:33, 17 October 2020DG Regio talk contribs 13,103 bytes +143 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:3317:33, 17 October 2020DG Regio talk contribs 12,960 bytes −137 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:3317:33, 17 October 2020DG Regio talk contribs 13,097 bytes +1,978 Created claim: summary (P836): The main objective of the project is to diversify energy supply and increase the energy security of the company ZACISZE Bożena Struk to 31.12.2018. Specific objectives: 1. Diversification of energy sources and creating conditions for generating electricity at the level of 40 kW from RES thanks to the use of a renewable source of solar energy 2.Implementation of intelligent energy management system minimising energy losses generating high operati...
  • curprev 17:3317:33, 17 October 2020DG Regio talk contribs 11,119 bytes −1,533 Removed claim: summary (P836): The main aim of the project is to diversify the energy supply and to increase the energy security of the company Zapasze Bożena Struk to 31.12.2018. Specific objectives: 1. Diversification of energy sources and creation of conditions for electricity generation capacity of 40 kW from RES by means of the use of renewable solar source 2.Implementation of a system of smart energy management that minimises energy losses that generates high costs fo...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:1209:12, 9 March 2020DG Regio talk contribs 11,370 bytes +1,533 Created claim: summary (P836): The main aim of the project is to diversify the energy supply and to increase the energy security of the company Zapasze Bożena Struk to 31.12.2018. Specific objectives: 1. Diversification of energy sources and creation of conditions for electricity generation capacity of 40 kW from RES by means of the use of renewable solar source 2.Implementation of a system of smart energy management that minimises energy losses that generates high costs for...

24 February 2020

18 February 2020

31 January 2020

14 January 2020