Revision history of "Production of electricity from RES in PARK Sp. z o.o." (Q104971)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:1215:12, 7 October 2024DG Regio talk contribs 74,775 bytes −8 Changed label, description and/or aliases in pt
  • curprev 15:1215:12, 7 October 2024DG Regio talk contribs 74,783 bytes +56 Set a claim value: summary (P836): O projeto tem por objeto a construção de uma exploração fotovoltaica em Sitaniec Błonie, no distrito de Zamość. A eletricidade produzida pela exploração – cerca de 95,61 MWh – será concebida para satisfazer as necessidades próprias do requerente e a produção excedentária será transferida para a rede elétrica local. A instalação projetada será montada em armações feitas de perfis ce e perfis de chapéu num sistema independente. A área do terreno é de...

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1619:16, 2 March 2023DG Regio talk contribs 72,330 bytes −734 Changed label, description and/or aliases in lv, it, da, ro, sv, fr, ga, sk, hu, bg, nl, mt, et, es, hr, cs, de, fi, sl, el, lt, pt, and other parts

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 12:5612:56, 2 July 2022DG Regio talk contribs 70,946 bytes +45,411 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:2009:20, 1 December 2021DG Regio talk contribs 15,635 bytes +2,458 Created claim: summary (P836): L’objet du projet est la construction d’une ferme photovoltaïque à Sitaniec Błonie dans le district de Zamojski. Électricité produite par la ferme — env. 95,61 MWh — sera utilisé pour répondre aux besoins propres du demandeur et la production excédentaire sera transférée au réseau électrique local. L’installation conçue sera montée sur des cadres constitués de profilés d’enveloppe et de profilés de chapeau dans un système autoportant. La surface...
  • curprev 09:2009:20, 1 December 2021DG Regio talk contribs 13,177 bytes +125 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 17:3317:33, 17 October 2020DG Regio talk contribs 13,491 bytes +112 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:3317:33, 17 October 2020DG Regio talk contribs 13,379 bytes −112 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:3317:33, 17 October 2020DG Regio talk contribs 13,491 bytes +2,265 Created claim: summary (P836): The subject of the project is the construction of a photovoltaic farm in Sitaniec Błonie in Zamość County. Electricity generated by the farm – approx. 95,61 MWh – will be designed to meet the applicant’s own needs and surplus production will be transferred to the local power grid. The designed installation will be mounted on frames made of ce-profiles and hat profiles in a freestanding system. The area of the plot is 4.100 sqm, which will allow...
  • curprev 17:3317:33, 17 October 2020DG Regio talk contribs 11,226 bytes −1,756 Removed claim: summary (P836): The object of the project is the construction of a photovoltaic farm in the town of Sitaiec situated in the town of town of Zamora. Electricity produced by the farm — ca. 95.61 MWh will be used to meet the applicant’s own needs and the excess production will be transferred to the local energy network. The design of the installation will be mounted on the steppe of the coil profiles and on the block frames in the free-standing system. The area...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:1209:12, 9 March 2020DG Regio talk contribs 11,693 bytes +1,756 Created claim: summary (P836): The object of the project is the construction of a photovoltaic farm in the town of Sitaiec situated in the town of town of Zamora. Electricity produced by the farm — ca. 95.61 MWh will be used to meet the applicant’s own needs and the excess production will be transferred to the local energy network. The design of the installation will be mounted on the steppe of the coil profiles and on the block frames in the free-standing system. The area of...

24 February 2020

18 February 2020

31 January 2020

14 January 2020