Revision history of "Production of renewable energy in the Lublin Diagnostic Centre" (Q104970)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:1118:11, 8 October 2024DG Regio talk contribs 66,493 bytes +3 Changed label, description and/or aliases in pt
  • curprev 18:1118:11, 8 October 2024DG Regio talk contribs 66,490 bytes +7 Set a claim value: summary (P836): O projeto tem por objeto a construção de duas instalações fotovoltaicas — uma com uma capacidade de 17,50 kW (instalação de telhado) e outra com uma capacidade de 20,00 kW (instalação terrestre) — instalações de produção de energia a partir de fontes renováveis. O principal objetivo do projeto é aumentar a competitividade do Centro de Diagnóstico de Lublin através do investimento em fontes de energia renováveis e da proteção e melhoria do ambiente....

20 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 11:2511:25, 27 July 2022DG Regio talk contribs 61,434 bytes +38,441 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:2009:20, 1 December 2021DG Regio talk contribs 14,595 bytes +2,082 Created claim: summary (P836): L’objet du projet est la construction de deux installations photovoltaïques — l’une d’une capacité de 17,50 kW (installation de toit) et l’autre d’une capacité de 20,00 kW (installation au sol) — des installations de production d’énergie à partir de sources renouvelables. L’objectif principal du projet est d’accroître la compétitivité du Centre de diagnostic de Lublin en investissant dans les sources d’énergie renouvelables et en protégeant et a...
  • curprev 09:2009:20, 1 December 2021DG Regio talk contribs 12,513 bytes +129 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 17:3317:33, 17 October 2020DG Regio talk contribs 12,823 bytes +121 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:3317:33, 17 October 2020DG Regio talk contribs 12,702 bytes −125 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:3317:33, 17 October 2020DG Regio talk contribs 12,827 bytes +1,896 Created claim: summary (P836): The subject of the project is the construction of two photovoltaic installations – one with a capacity of 17.50 kW (roof installation) and the other with a capacity of 20.00 kW (terrestrial installation) – installations for the production of energy from renewable sources. The main goal of the project is to increase the competitiveness of the Lublin Diagnostic Centre by investing in renewable energy sources and protecting and improving the enviro...
  • curprev 17:3317:33, 17 October 2020DG Regio talk contribs 10,931 bytes −1,449 Removed claim: summary (P836): The project consists of the construction of two photovoltaic installations, one with a power of 17.50 kW (roof installation) and one with 20.00 kW (terrestrial) — installations for the production of energy from renewable sources. The main objectives of the project are to improve the competitiveness of the Lublin Diagnostic Centre by investing in renewable energy sources and by protecting and improving the state of the environment. AS A RESULT...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:1209:12, 9 March 2020DG Regio talk contribs 11,102 bytes +1,449 Created claim: summary (P836): The project consists of the construction of two photovoltaic installations, one with a power of 17.50 kW (roof installation) and one with 20.00 kW (terrestrial) — installations for the production of energy from renewable sources. The main objectives of the project are to improve the competitiveness of the Lublin Diagnostic Centre by investing in renewable energy sources and by protecting and improving the state of the environment. AS A RESULT OF...

24 February 2020

18 February 2020

31 January 2020

14 January 2020