Revision history of "Construction of a photovoltaic installation with a power of 950 kW (999.6 kWp) including technical infrastructure, transformer station, internal cable installations and cable connection of SN to the power grid on plots no 10/3, 11, 243/3 in Tomaszów Lube" (Q104922)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:0018:00, 9 October 2024DG Regio talk contribs 95,263 bytes +10 Changed label, description and/or aliases in pt
  • curprev 18:0018:00, 9 October 2024DG Regio talk contribs 95,253 bytes +4 Set a claim value: summary (P836): O objetivo do projeto «Construção de uma instalação fotovoltaica com uma capacidade de 950 kW (999,6 kWp), juntamente com infraestruturas técnicas, estação de transformação, instalações de cabos internos e ligação por cabo da SN à rede elétrica nas parcelas n.os 10/3, 11, 243/3 em Tomaszów Lubelski, município de Tomaszów Lubelski» é a construção de uma exploração fotovoltaica com uma capacidade de 999,6 kWp, a partir da qual a quantidade de energia...

22 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1519:15, 2 March 2023DG Regio talk contribs 92,852 bytes −485 Changed label, description and/or aliases in lv, it, da, sk, pt, de, cs, ro, et, lt, sv, ga, bg, fr, hu, es, hr, sl, fi, el, nl, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 11:2511:25, 27 July 2022DG Regio talk contribs 91,223 bytes +59,941 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1409:14, 1 December 2021DG Regio talk contribs 18,119 bytes +3,087 Created claim: summary (P836): L’objectif du projet «Construction d’une installation photovoltaïque de 950 kW (999,6 kWp) ainsi que de l’infrastructure technique, de la station de transformation, des installations de câbles internes et du raccordement du câble SN au réseau électrique sur les parcelles 10/3, 11, 243/3 à Tomaszów Lubelski, commune de Tomaszów Lubelski» est de construire une exploitation photovoltaïque d’une capacité de 999,6 kWp, dont la quantité annuelle d’éne...
  • curprev 09:1409:14, 1 December 2021DG Regio talk contribs 15,032 bytes +367 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 17:1317:13, 17 October 2020DG Regio talk contribs 15,104 bytes +347 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:1317:13, 17 October 2020DG Regio talk contribs 14,757 bytes −334 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:1317:13, 17 October 2020DG Regio talk contribs 15,091 bytes +2,804 Created claim: summary (P836): The aim of the project “Building a photovoltaic installation with a capacity of 950 kW (999.6 kWp) together with technical infrastructure, transformer station, internal cable installations and cable connection of SN to the power grid on plots no 10/3, 11, 243/3 in Tomaszów Lubelski, Tomaszów Lubelski commune” is the construction of a photovoltaic farm with a capacity of 999,6 kWp, from which the amount of energy produced per year will be 1020 MW...
  • curprev 17:1317:13, 17 October 2020DG Regio talk contribs 12,287 bytes −2,214 Removed claim: summary (P836): The project ‘Construction of a 950kWp photovoltaic installation with a technical infrastructure, a transformer station, internal cable and the cable SN for the electricity grid on plots Nos 10/3, 11, 243/3 in Tomaszów Lubelski’, the municipality of Tomaszów Lubelski’ is the construction of a 999,6 kWp photovoltaic farm with a yearly energy output of 1 020 MWh. The amount of energy for the installation’s own operation is 10 MWh/year. Net electr...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:1209:12, 9 March 2020DG Regio talk contribs 13,225 bytes +2,214 Created claim: summary (P836): The project ‘Construction of a 950kWp photovoltaic installation with a technical infrastructure, a transformer station, internal cable and the cable SN for the electricity grid on plots Nos 10/3, 11, 243/3 in Tomaszów Lubelski’, the municipality of Tomaszów Lubelski’ is the construction of a 999,6 kWp photovoltaic farm with a yearly energy output of 1 020 MWh. The amount of energy for the installation’s own operation is 10 MWh/year. Net electric...

24 February 2020

18 February 2020

31 January 2020

14 January 2020