Revision history of "Photovoltaic installation at PHU “HEMBUD”" (Q104917)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:0906:09, 9 October 2024DG Regio talk contribs 82,134 bytes 0 Changed label, description and/or aliases in pt
  • curprev 06:0906:09, 9 October 2024DG Regio talk contribs 82,134 bytes +132 Set a claim value: summary (P836): O âmbito material do projeto inclui: Aquisição e instalação de instalações FER: — Instalação fotovoltaica com uma capacidade de 17,92 kWp e uma área de 106,9 m2 no edifício pertencente à instalação beneficiária na localização de Puławy, ul. Componente 6A constituído por: — módulos fotovoltaicos — 64 unidades. — inversor — 1 unidade; sistema de montagem – sistema de cobertura; — conectores femininos e masculinos; — cablagem — é responsável pela trans...

23 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1519:15, 2 March 2023DG Regio talk contribs 79,605 bytes −2,624 Changed label, description and/or aliases in da, it, sk, sv, el, fi, et, cs, ga, fr, bg, lv, hu, ro, pt, lt, hr, de, es, mt, nl, sl, and other parts

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 12:5512:55, 2 July 2022DG Regio talk contribs 80,118 bytes +51,998 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1409:14, 1 December 2021DG Regio talk contribs 16,690 bytes +2,854 Created claim: summary (P836): La portée matérielle du projet comprend: Achat et installation d’installations SER: — Installation photovoltaïque d’une capacité de 17,92 kWc et d’une superficie de 106,9 m² sur le bâtiment de la propriété du bénéficiaire à Puławy, ul. Le composant 6A est composé de: — modules photovoltaïques — 64 pièces. — onduleur — 1 pièce; système d’installation — toit; — connecteurs femelles et mâles; — câblage — est responsable du transfert du courant élec...
  • curprev 09:1409:14, 1 December 2021DG Regio talk contribs 13,836 bytes +105 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 17:1317:13, 17 October 2020DG Regio talk contribs 14,170 bytes +104 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:1317:13, 17 October 2020DG Regio talk contribs 14,066 bytes −104 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:1317:13, 17 October 2020DG Regio talk contribs 14,170 bytes +2,656 Created claim: summary (P836): The Project’s material scope includes: Purchase and installation of RES installations: — Photovoltaic installation with a capacity of 17.92 kWp and an area of 106.9 m² on the building belonging to the Beneficiary facility in the location of Puławy, ul. Component 6A consisting of: — photovoltaic modules – 64 pcs. — inverter – 1 pcs; mounting system – roofing system; — female and male connectors; — wiring – is responsible for transmitting electric...
  • curprev 17:1317:13, 17 October 2020DG Regio talk contribs 11,514 bytes −2,218 Removed claim: summary (P836): The material scope of the Project includes: Purchase and installation of RES installations: A photovoltaic installation with a capacity of 17,92 kWp and a surface of 106.9 m² on a building belonging to the Beneficiary in Puławy, ul. Component 6A component consisting of: Solar modules — 64. — Franger — 1; installation system — roof; Female and male sectors; — wiring — responsible for transmitting the electrical current from the modules to the w...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:1209:12, 9 March 2020DG Regio talk contribs 12,462 bytes +2,218 Created claim: summary (P836): The material scope of the Project includes: Purchase and installation of RES installations: A photovoltaic installation with a capacity of 17,92 kWp and a surface of 106.9 m² on a building belonging to the Beneficiary in Puławy, ul. Component 6A component consisting of: Solar modules — 64. — Franger — 1; installation system — roof; Female and male sectors; — wiring — responsible for transmitting the electrical current from the modules to the wav...

24 February 2020

18 February 2020

31 January 2020

14 January 2020