Revision history of "Improving the cost-efficiency of JG Service by generating electricity from renewable sources for own use" (Q104906)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:1115:11, 7 October 2024DG Regio talk contribs 86,386 bytes −5 Changed label, description and/or aliases in pt
  • curprev 15:1115:11, 7 October 2024DG Regio talk contribs 86,391 bytes +3 Set a claim value: summary (P836): O objetivo do projeto é construir uma instalação fotovoltaica terrestre de 39,6 kWp baseada em módulos fotovoltaicos monocristalinos com uma capacidade de 300 Wp em Lublin na dz. n.o 120/3 circunferência 44 arca. 6. Assumimos que toda a eletricidade gerada pelo sistema será consumida para as suas próprias necessidades, além disso, através de uma ligação adequada à rede elétrica, pode fornecer energia excedentária produzida (dias livres de trabalho)....

7 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 12:5412:54, 2 July 2022DG Regio talk contribs 81,034 bytes +52,463 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1409:14, 1 December 2021DG Regio talk contribs 16,902 bytes +2,916 Created claim: summary (P836): L’objectif du projet est de construire une installation photovoltaïque au sol d’une capacité de 39,6 kWp basée sur des modules photovoltaïques monocristallins d’une puissance de 300 Wp à Lublin sur la base du volume no. 120/3 des 44 arches. 6. Nous supposons que toute l’électricité produite par le système sera consommée pour la consommation propre, en outre, grâce à une connexion appropriée au réseau électrique, il peut redonner l’excédent d’éne...
  • curprev 09:1409:14, 1 December 2021DG Regio talk contribs 13,986 bytes +216 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 17:1217:12, 17 October 2020DG Regio talk contribs 14,209 bytes +164 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:1217:12, 17 October 2020DG Regio talk contribs 14,045 bytes −157 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:1217:12, 17 October 2020DG Regio talk contribs 14,202 bytes +2,576 Created claim: summary (P836): The aim of the project is to build a 39.6 kWp terrestrial photovoltaic installation based on monocrystalline photovoltaic modules with a capacity of 300 Wp in Lublin on dz. no. 120/3 circumference 44 ark. 6. We assume that all the electricity generated by the system will be consumed for its own needs, in addition, through an appropriate connection to the power grid, it can provide surplus energy produced (work-free days). The photovoltaic instal...
  • curprev 17:1217:12, 17 October 2020DG Regio talk contribs 11,626 bytes −1,985 Removed claim: summary (P836): The aim of the project is to construct a 39,6kWp terrestrial photovoltaic installation based on the 300 Wp mono-crystalline photovoltaic modules in Lublin, no ewied. 120/3 of 44 ark rim. 6. We assume that all electricity generated by the system will be consumed for its own account, in addition to the corresponding power connection to the grid, can cast excess energy (public holidays). The photovoltaic installation will be constructed from sola...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:1209:12, 9 March 2020DG Regio talk contribs 12,324 bytes +1,985 Created claim: summary (P836): The aim of the project is to construct a 39,6kWp terrestrial photovoltaic installation based on the 300 Wp mono-crystalline photovoltaic modules in Lublin, no ewied. 120/3 of 44 ark rim. 6. We assume that all electricity generated by the system will be consumed for its own account, in addition to the corresponding power connection to the grid, can cast excess energy (public holidays). The photovoltaic installation will be constructed from solar...

24 February 2020

18 February 2020

31 January 2020

14 January 2020