Revision history of "Photovoltaic installation at P.H.U. Elmar Lesiuk sp.j." (Q104905)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 11:2511:25, 27 July 2022DG Regio talk contribs 78,675 bytes +50,994 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1409:14, 1 December 2021DG Regio talk contribs 16,615 bytes +2,806 Created claim: summary (P836): L’objectif principal du projet est d’optimiser la consommation d’électricité nécessaire au fonctionnement de l’entreprise et d’accroître la sécurité énergétique de l’entreprise à travers la diversification des approvisionnements en énergie. L’objectif sera atteint par l’achat et l’installation d’une nouvelle installation solaire photovoltaïque technologiquement avancée. L’assemblage se déroulera en un seul endroit, c’est-à-dire sur le bâtiment d...
  • curprev 09:1409:14, 1 December 2021DG Regio talk contribs 13,809 bytes +115 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 17:1217:12, 17 October 2020DG Regio talk contribs 14,133 bytes +113 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:1217:12, 17 October 2020DG Regio talk contribs 14,020 bytes −112 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:1217:12, 17 October 2020DG Regio talk contribs 14,132 bytes +2,509 Created claim: summary (P836): The main objective of the project is to optimise the consumption of electricity necessary for the operation of the company and to increase the company’s energy security through diversification of energy supply. The goal will be achieved through the purchase and installation of a new, technologically advanced solar photovoltaic installation. Assembly will take place in one location, i.e. on the building in which the applicant currently carries ou...
  • curprev 17:1217:12, 17 October 2020DG Regio talk contribs 11,623 bytes −2,096 Removed claim: summary (P836): The main objective of the PROJECT is to optimise the electricity consumption necessary for the operation of the company and to increase the energy security of the firm through diversification of energy supply. The objective will be achieved by buying and mounting a new high-tech photovoltaic installation that produces electricity from solar energy. The installation will be located in a single location, i.e. the building where the applicant is...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:1209:12, 9 March 2020DG Regio talk contribs 12,439 bytes +2,096 Created claim: summary (P836): The main objective of the PROJECT is to optimise the electricity consumption necessary for the operation of the company and to increase the energy security of the firm through diversification of energy supply. The objective will be achieved by buying and mounting a new high-tech photovoltaic installation that produces electricity from solar energy. The installation will be located in a single location, i.e. the building where the applicant is cu...

24 February 2020

18 February 2020

31 January 2020

14 January 2020