Revision history of "Photovoltaic installation at Leszek Jargiło – “Unilech”" (Q104904)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 12:5412:54, 2 July 2022DG Regio talk contribs 86,446 bytes +56,014 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1409:14, 1 December 2021DG Regio talk contribs 17,572 bytes +3,287 Created claim: summary (P836): L’objet du projet est un investissement lié à l’installation, l’assemblage et la mise en service de panneaux photovoltaïques d’une capacité maximale de 20,16 kWp dans la municipalité de Dzwola 82A dans le bâtiment du séchoir à bois. Le projet sera axé sur l’utilisation de l’énergie produite à partir de sources renouvelables, à savoir l’énergie solaire à des fins d’autoconsommation associée au processus de séchage de l’arbre. La période de mise e...
  • curprev 09:1409:14, 1 December 2021DG Regio talk contribs 14,285 bytes +122 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 17:1217:12, 17 October 2020DG Regio talk contribs 14,602 bytes +121 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:1217:12, 17 October 2020DG Regio talk contribs 14,481 bytes −117 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:1217:12, 17 October 2020DG Regio talk contribs 14,598 bytes +2,800 Created claim: summary (P836): The subject of the project is an investment related to installation, installation and commissioning of photovolt panels with a power up to 20.16 kWp in the municipality of Dzwola 82A in the wood dryer building. The project will focus on the use of energy from renewable sources, namely solar energy for own purposes related to the drying of trees. Project implementation period is from 01.07.17 to 30.04.18 The investment will be connected with inst...
  • curprev 17:1217:12, 17 October 2020DG Regio talk contribs 11,798 bytes −2,301 Removed claim: summary (P836): The project consists of an investment in the installation, installation and installation of a 20,16kWp panel in the building of the building plant for 82A in the building plant. The project will focus on the use of energy from renewable sources, namely the sun’s own energy from the drying process of the tree. The duration of the project shall be between 01.07.17 and 30.04.18. the investment will relate to the installation of 72 panels. Solar p...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:1209:12, 9 March 2020DG Regio talk contribs 12,821 bytes +2,301 Created claim: summary (P836): The project consists of an investment in the installation, installation and installation of a 20,16kWp panel in the building of the building plant for 82A in the building plant. The project will focus on the use of energy from renewable sources, namely the sun’s own energy from the drying process of the tree. The duration of the project shall be between 01.07.17 and 30.04.18. the investment will relate to the installation of 72 panels. Solar pho...

24 February 2020

18 February 2020

31 January 2020

14 January 2020