Revision history of "Construction of a photovoltaic farm in Marianka" (Q104891)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 12:5412:54, 2 July 2022DG Regio talk contribs 85,362 bytes +55,605 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 17,348 bytes +3,070 Created claim: summary (P836): Le projet concerne la construction d’une centrale photovoltaïque d’une puissance installée de 0,99 MW sur une partie du terrain no 136/2 dans la commune de Stary Brus. Le demandeur a droit à la propriété sur laquelle il sera construit jusqu’au 31.12.2035 sur la base d’un contrat de bail avec dn. 15.04.2016. La centrale sera composée de panneaux photovoltaïques hautes performances (3768 pièces d’une puissance de 265 W, en supposant un rendement d...
  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 14,278 bytes +113 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 17:1217:12, 17 October 2020DG Regio talk contribs 14,604 bytes +106 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:1217:12, 17 October 2020DG Regio talk contribs 14,498 bytes −106 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:1217:12, 17 October 2020DG Regio talk contribs 14,604 bytes +2,819 Created claim: summary (P836): The subject of the project is the construction of a photovoltaic power plant with installed capacity of 0.99 MW on part of plot No 136/2 within the Old Brus Municipality. The applicant has the right to the property on which it will be built until 31.12.2035 under the lease agreement with the date. 15.04.2016. The power plant will consist of high-performance photovoltaic panels (3768 units with a capacity of 265 W, assuming a high minimum module...
  • curprev 17:1217:12, 17 October 2020DG Regio talk contribs 11,785 bytes −2,006 Removed claim: summary (P836): The project consists of the construction of a PV power plant with an installed capacity of 0.99 MW on part of the plot No 136/2 within the Municipality of Stary Bras. The applicant has the right to the property on which he will be built up to 31.12.2035 under the lease contract of 15.04.2016. The plant will consist of high performance solar panels (3768 units with a power rating of 265 W, assuming a high minimum performance factor of 16.2 %) i...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:1109:11, 9 March 2020DG Regio talk contribs 12,496 bytes +2,006 Created claim: summary (P836): The project consists of the construction of a PV power plant with an installed capacity of 0.99 MW on part of the plot No 136/2 within the Municipality of Stary Bras. The applicant has the right to the property on which he will be built up to 31.12.2035 under the lease contract of 15.04.2016. The plant will consist of high performance solar panels (3768 units with a power rating of 265 W, assuming a high minimum performance factor of 16.2 %) ins...

24 February 2020

18 February 2020

31 January 2020

14 January 2020