Revision history of "Increase in the use of RES – photovoltaic installation 39.52 kW Gozdów" (Q104869)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 15:5815:58, 10 October 2024DG Regio talk contribs 94,732 bytes −4 Changed label, description and/or aliases in pt
  • curprev 15:5815:58, 10 October 2024DG Regio talk contribs 94,736 bytes +22 Set a claim value: summary (P836): O projecto enquadra-se nos objectivos da acção 4.2 Produção de energia FER nas empresas, eixo prioritário IV. Energia respeitadora do ambiente RPO WL 2014-2020 e diz respeito à construção de instalações para a produção de eletricidade a partir de fontes renováveis (construção de uma nova instalação FER das unidades 1 com uma capacidade de 0,04 MWW e produção líquida média prevista de eletricidade durante a vida útil do projeto inferior a 400 MWh/ano...

22 March 2024

15 January 2024

12 June 2023

24 May 2023

3 March 2023

  • curprev 00:0100:01, 3 March 2023DG Regio talk contribs 92,317 bytes −482 Changed label, description and/or aliases in da, it, sk, fi, ga, de, bg, hu, sv, pt, et, ro, mt, hr, sl, el, cs, lt, fr, es, nl, lv, and other parts

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 12:5412:54, 2 July 2022DG Regio talk contribs 90,675 bytes +59,815 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1209:12, 1 December 2021DG Regio talk contribs 17,678 bytes +3,257 Created claim: summary (P836): Le projet est conforme aux objectifs de la mesure 4.2 Production d’énergie SER dans les entreprises, axe prioritaire IV. Énergie respectueuse de l’environnement pour le ROP WL 2014-2020 et concerne la construction d’installations de production d’électricité à partir de sources renouvelables (construction d’une nouvelle installation RES 1 d’une capacité de 0,04 MW et d’une production nette d’électricité prévue sur la durée de vie du projet inféri...
  • curprev 09:1209:12, 1 December 2021DG Regio talk contribs 14,421 bytes +149 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 17:0717:07, 17 October 2020DG Regio talk contribs 14,711 bytes +132 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:0717:07, 17 October 2020DG Regio talk contribs 14,579 bytes −138 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:0717:07, 17 October 2020DG Regio talk contribs 14,717 bytes +2,963 Created claim: summary (P836): The project fits into the objectives of action 4.2 Production of RES energy in enterprises, Priority Axis IV. Environmentally friendly energy RPO WL 2014-2020 and concerns the construction of installations for the production of electricity from renewable sources (construction of a new RES installation of units 1 with a capacity of 0,04 MWW and planned average net production of electricity during the project’s lifetime of less than 400 MWh/year)....
  • curprev 17:0717:07, 17 October 2020DG Regio talk contribs 11,754 bytes −2,404 Removed claim: summary (P836): The project fits in with the objectives of Action 4.2: production of energy from renewable sources in enterprises, Priority IV. Environmentally friendly energy ROP WL 2014-2020 and concerns the construction of an installation for the production of electricity from renewable sources (construction of a new RES installation 1 with a capacity of 0.04 MW and a planned average net generation of electricity over the project lifetime of less than 400 ...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:1109:11, 9 March 2020DG Regio talk contribs 12,864 bytes +2,404 Created claim: summary (P836): The project fits in with the objectives of Action 4.2: production of energy from renewable sources in enterprises, Priority IV. Environmentally friendly energy ROP WL 2014-2020 and concerns the construction of an installation for the production of electricity from renewable sources (construction of a new RES installation 1 with a capacity of 0.04 MW and a planned average net generation of electricity over the project lifetime of less than 400 MW...

24 February 2020

18 February 2020

31 January 2020

14 January 2020