Revision history of "Photovoltaic installation at Longina SPRYSZAK FIRMA HANDLOWA" (Q104865)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 03:5003:50, 11 October 2024DG Regio talk contribs 85,393 bytes +48 Set a claim value: summary (P836): No âmbito do projeto haverá um único pedido que consiste na aquisição e montagem de duas instalações fotovoltaicas em dois locais com os seguintes parâmetros: Potência do gerador fotovoltaico: 14,28 e 29,96 kWp, superfície do gerador fotovoltaico: 85,2 e 178,7 m2, número de módulos fotovoltaicos: 51 e 107 unidades, número de inversores: 1 e 2 peças. O principal objetivo deste projeto é, por um lado, aumentar a segurança energética da empresa do requ...

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1519:15, 2 March 2023DG Regio talk contribs 82,948 bytes −403 Changed label, description and/or aliases in lv, it, sv, da, ro, fr, bg, sk, de, et, cs, fi, sl, el, hu, nl, mt, hr, lt, es, and other parts

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 12:5312:53, 2 July 2022DG Regio talk contribs 81,230 bytes +52,766 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1209:12, 1 December 2021DG Regio talk contribs 16,962 bytes +2,921 Created claim: summary (P836): Dans le cadre du projet, il y aura UNE REQUIREMENT consistant en l’achat et l’installation de deux INSTALLATIONS photovoltaïques dans deux localisations avec les paramètres suivants: puissance du générateur PV: 14,28 et 29,96 kWp, surface de générateur photovoltaïque: 85,2 et 178,7 m², nombre de modules PV: 51 et 107 unités, nombre d’onduleurs: 1 et 2 pièces. Le principal objectif de ce projet est, d’une part, d’accroître la sécurité énergétique...
  • curprev 09:1209:12, 1 December 2021DG Regio talk contribs 14,041 bytes +122 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 17:0717:07, 17 October 2020DG Regio talk contribs 14,358 bytes +119 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:0717:07, 17 October 2020DG Regio talk contribs 14,239 bytes −116 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:0717:07, 17 October 2020DG Regio talk contribs 14,355 bytes +2,624 Created claim: summary (P836): Within the framework of the project there will be a single request consisting of the purchase and assembly of two photovoltaic Installations in two locations with the following parameters: PV generator power: 14,28 and 29,96 kWp, PV generator surface: 85,2 and 178,7 m², number of PV modules: 51 and 107 pcs, number of inverters: 1 and 2 pcs. The main objective of this project is, on the one hand, to increase the energy security of the Applicant’s...
  • curprev 17:0717:07, 17 October 2020DG Regio talk contribs 11,731 bytes −2,139 Removed claim: summary (P836): The project will be carried out in the context of the project consisting of the purchase and installation of the TWO of solar PV in the DWÓCH, with the following parameters: PV generator power: 14,28 and 29,96 kWp, generator area PV: 85,2 and 178.7 m², number of PV modules: 51 and 107 units, number of inverters: 1 and 2 units The aim of this project is, on the one hand, to increase the applicant’s energy security by diversifying its energy sup...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:1109:11, 9 March 2020DG Regio talk contribs 12,601 bytes +2,139 Created claim: summary (P836): The project will be carried out in the context of the project consisting of the purchase and installation of the TWO of solar PV in the DWÓCH, with the following parameters: PV generator power: 14,28 and 29,96 kWp, generator area PV: 85,2 and 178.7 m², number of PV modules: 51 and 107 units, number of inverters: 1 and 2 units The aim of this project is, on the one hand, to increase the applicant’s energy security by diversifying its energy suppl...

24 February 2020

18 February 2020

31 January 2020

14 January 2020