Revision history of "Construction of a photovoltaic installation for the production of power for ROTOR" (Q104863)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:1115:11, 7 October 2024DG Regio talk contribs 88,808 bytes +10 Changed label, description and/or aliases in pt
  • curprev 15:1115:11, 7 October 2024DG Regio talk contribs 88,798 bytes +54 Set a claim value: summary (P836): O projeto consiste na construção da instalação de painéis fotovoltaicos no telhado da empresa ROTOR Machine Mechanics Department Ryszard Walczak em Motycz, Motycz 325C. A instalação é constituída por 60 painéis fotovoltaicos com uma potência unitária de 265 Wp e uma potência de instalação de 15,9 kWp. A instalação produzirá eletricidade para as necessidades da ROTOR. O objetivo do projeto é aumentar a competitividade da empresa através da redução do...

20 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 12:5312:53, 2 July 2022DG Regio talk contribs 84,481 bytes +55,009 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1209:12, 1 December 2021DG Regio talk contribs 17,370 bytes +3,014 Created claim: summary (P836): Le projet consiste en la construction de panneaux photovoltaïques sur le toit de l’usine ROTOR Mechanics Machines Ryszard Walczak à Motycz, Motycz 325C. L’installation se compose de 60 panneaux photovoltaïques d’une puissance unitaire de 265 Wp, puissance d’installation 15,9 kWp. L’installation produira de l’électricité pour les besoins de ROTOR. L’objectif du projet est d’accroître la compétitivité de l’entreprise en réduisant les coûts de cons...
  • curprev 09:1209:12, 1 December 2021DG Regio talk contribs 14,356 bytes +152 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 17:0717:07, 17 October 2020DG Regio talk contribs 14,643 bytes +140 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:0717:07, 17 October 2020DG Regio talk contribs 14,503 bytes −136 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:0717:07, 17 October 2020DG Regio talk contribs 14,639 bytes +2,783 Created claim: summary (P836): The project consists of the construction of the installation of photovoltaic panels on the roof of the company ROTOR Machine Mechanics Department Ryszard Walczak in Motycz, Motycz 325C. The installation consists of 60 photovoltaic panels with a unit output of 265 Wp, installation power of 15,9 kWp. The installation will produce electricity for ROTOR’s needs. The aim of the project is to increase the competitiveness of the company by reducing the...
  • curprev 17:0717:07, 17 October 2020DG Regio talk contribs 11,856 bytes −2,324 Removed claim: summary (P836): The project consists of the construction of the installation of the photovoltaic panels on the roof of the building company Otor Machinery Zakład Mechanics, Ryszard Walczak, Motycz, Motycz 325C. The installation consists of 60 solar panels with a unit capacity of 265 Wp, an installation capacity of 15,9 kWp. The installation will produce electricity for the company. The aim of the project is to increase the competitiveness of the company by re...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2709:27, 9 March 2020DG Regio talk contribs 12,896 bytes +2,324 Created claim: summary (P836): The project consists of the construction of the installation of the photovoltaic panels on the roof of the building company Otor Machinery Zakład Mechanics, Ryszard Walczak, Motycz, Motycz 325C. The installation consists of 60 solar panels with a unit capacity of 265 Wp, an installation capacity of 15,9 kWp. The installation will produce electricity for the company. The aim of the project is to increase the competitiveness of the company by redu...

24 February 2020

18 February 2020

31 January 2020

14 January 2020