Revision history of "Photovoltaic installation in POLMAR" (Q104862)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:1115:11, 7 October 2024DG Regio talk contribs 79,657 bytes 0 Changed label, description and/or aliases in pt
  • curprev 15:1115:11, 7 October 2024DG Regio talk contribs 79,657 bytes +10 Set a claim value: summary (P836): Este projeto envolve a criação de uma instalação para a produção de energia a partir de fontes renováveis (FER) – uma instalação fotovoltaica com uma capacidade de 40 kWp em telhados de 2 edifícios em Wymysłówka, município de Bełżyce, powiat lubelski. A instalação produzirá eletricidade para as atividades comerciais realizadas pelo requerente. O excesso de energia que não será utilizado para o negócio será descarregado para a Rede de Distribuição (v...

23 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 12:5312:53, 2 July 2022DG Regio talk contribs 74,291 bytes +47,474 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 16,159 bytes +2,697 Created claim: summary (P836): Ce projet comprend la mise en place d’une installation de production d’énergie renouvelable (RES) — une installation photovoltaïque d’une capacité de 40 kWp sur les toits de 2 bâtiments à Wymysłówka, la municipalité de Bełżyce, le district de Lubelski. L’installation produira de l’électricité aux fins de l’activité économique exercée par la requérante. L’énergie excédentaire qui ne sera pas utilisée pour l’opération sera injectée dans le réseau...
  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 13,462 bytes +97 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 17:0717:07, 17 October 2020DG Regio talk contribs 13,804 bytes +94 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:0717:07, 17 October 2020DG Regio talk contribs 13,710 bytes −91 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:0717:07, 17 October 2020DG Regio talk contribs 13,801 bytes +2,381 Created claim: summary (P836): This project involves the creation of an installation for the production of energy from renewable sources (RES) – a photovoltaic installation with a capacity of 40 kWp on roofs of 2 buildings in Wymysłówka, commune Bełżyce, powiat lubelski. The installation will generate electricity for business activities carried out by the Applicant. The excess energy that will not be used for business will be discharged to the Distribution Network (sold). The...
  • curprev 17:0717:07, 17 October 2020DG Regio talk contribs 11,420 bytes −1,883 Removed claim: summary (P836): This project involves the setting up of a renewable energy production facility (RES), a 40kWp photovoltaic power installation on the roof of 2 buildings in the town of Wymyłówka, the municipality of Bełżyce, the powiat lubelski. The installation will generate electricity for the business activities carried out by the Applicant. Surplus energy that will not be used for operations will be transferred to the Distribution Network (sold). The objec...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2709:27, 9 March 2020DG Regio talk contribs 12,009 bytes +1,883 Created claim: summary (P836): This project involves the setting up of a renewable energy production facility (RES), a 40kWp photovoltaic power installation on the roof of 2 buildings in the town of Wymyłówka, the municipality of Bełżyce, the powiat lubelski. The installation will generate electricity for the business activities carried out by the Applicant. Surplus energy that will not be used for operations will be transferred to the Distribution Network (sold). The objecti...

24 February 2020

18 February 2020

31 January 2020

14 January 2020