Revision history of "Increase in the use of RES – photovoltaic installation 0.99 MW in Woroniec" (Q104844)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:1115:11, 7 October 2024DG Regio talk contribs 95,540 bytes +3 Changed label, description and/or aliases in pt
  • curprev 15:1115:11, 7 October 2024DG Regio talk contribs 95,537 bytes +29 Set a claim value: summary (P836): O projecto faz parte dos objectivos específicos da acção 4.2 Produção de energia FER nas empresas, eixo prioritário IV. Energia respeitadora do ambiente RPO WL 2014-2020 e diz respeito à construção de instalações para a produção de eletricidade a partir de fontes renováveis (construção de uma nova unidade de produção de instalações FER com uma capacidade de 0,99 MWW e produção líquida média prevista de eletricidade durante a vida útil do projeto de,...

23 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1519:15, 2 March 2023DG Regio talk contribs 93,111 bytes −624 Changed label, description and/or aliases in it, lv, sk, da, et, fi, el, hr, cs, sv, ro, pt, sl, fr, ga, lt, mt, de, hu, nl, bg, es, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 11:2411:24, 27 July 2022DG Regio talk contribs 91,630 bytes +60,107 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 17,997 bytes +3,407 Created claim: summary (P836): Le projet est conforme aux objectifs spécifiques de la mesure 4.2 Production d’énergie SER dans les entreprises, axe prioritaire IV. Énergie respectueuse de l’environnement pour le ROP WL 2014-2020 et concerne la construction d’installations de production d’électricité à partir de sources renouvelables (construction d’une nouvelle unité de production d’énergie renouvelable d’une capacité de 0,99 MW et d’une production nette d’électricité prévue...
  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 14,590 bytes +155 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:5916:59, 17 October 2020DG Regio talk contribs 14,874 bytes +135 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5916:59, 17 October 2020DG Regio talk contribs 14,739 bytes −112 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5916:59, 17 October 2020DG Regio talk contribs 14,851 bytes +3,020 Created claim: summary (P836): The project is part of the specific objectives of action 4.2 Production of RES energy in enterprises, Priority Axis IV. Environmentally friendly energy RPO WL 2014-2020 and concerns the construction of installations for the production of electricity from renewable sources (construction of a new generation unit of RES installations with a capacity of 0,99 MWW and planned average net production of electricity during the project’s lifetime of at le...
  • curprev 16:5916:59, 17 October 2020DG Regio talk contribs 11,831 bytes −2,584 Removed claim: summary (P836): The project fits in with the specific objectives of Action 4.2 Renewable energy production in enterprises, Priority IV. Environmentally friendly energy ROP WL 2014-2020 and concerns the construction of an installation for the production of electricity from renewable sources (construction of a new generation unit of RES installations with a capacity of 0.99 MW and a planned average net electricity production over the lifetime of the project of...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2709:27, 9 March 2020DG Regio talk contribs 13,125 bytes +2,584 Created claim: summary (P836): The project fits in with the specific objectives of Action 4.2 Renewable energy production in enterprises, Priority IV. Environmentally friendly energy ROP WL 2014-2020 and concerns the construction of an installation for the production of electricity from renewable sources (construction of a new generation unit of RES installations with a capacity of 0.99 MW and a planned average net electricity production over the lifetime of the project of at...

24 February 2020

18 February 2020

31 January 2020

14 January 2020