Revision history of "Construction of photovoltaic installations in the villages Ludwinów and Krepiec" (Q104841)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:1115:11, 7 October 2024DG Regio talk contribs 90,413 bytes +12 Changed label, description and/or aliases in pt
  • curprev 15:1115:11, 7 October 2024DG Regio talk contribs 90,401 bytes +36 Set a claim value: summary (P836): O projeto tem por objeto a construção de uma central fotovoltaica com uma potência instalada de 0,6 MW e de uma linha de cabos SN nas parcelas n.os 125, 111, 67 e 117 do município de Cyców, bem como a construção de uma instalação fotovoltaica com uma potência instalada de 0,031 MW que cubra as necessidades de eletricidade próprias da empresa, ul. Piasecka 32 A, Spinner no município de Melgiew. O candidato tem direitos sobre os bens imóveis em que o...

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 11:2411:24, 27 July 2022DG Regio talk contribs 84,877 bytes +55,076 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 17,478 bytes +3,100 Created claim: summary (P836): L’objet du projet est la construction d’une centrale photovoltaïque d’une puissance installée de 0,6 MW et d’une ligne de câble de SN sur les parcelles nos 125, 111, 67 et 117 dans la municipalité de Cyców et la construction d’une installation photovoltaïque d’une puissance installée de 0,031 MW couvrant les besoins propres de l’entreprise en électricité, ul. Piasecka 32 A, Krępiec dans la municipalité de Melgiev. Le demandeur a des droits sur l...
  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 14,378 bytes +130 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:5916:59, 17 October 2020DG Regio talk contribs 14,687 bytes +139 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5916:59, 17 October 2020DG Regio talk contribs 14,548 bytes −135 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5916:59, 17 October 2020DG Regio talk contribs 14,683 bytes +2,842 Created claim: summary (P836): The subject of the project is the construction of a photovoltaic power plant with installed capacity of 0,6 MW and a cable line of SN on plots no. 125, 111, 67 and 117 within the municipality of Cyców and the construction of a photovoltaic installation with an installed capacity of 0,031 MW covering the company’s own needs for electricity, ul. Piasecka 32 A, Spinner in the Municipality of Melgiew. The applicant has rights to the real estate on w...
  • curprev 16:5916:59, 17 October 2020DG Regio talk contribs 11,841 bytes −2,321 Removed claim: summary (P836): The project involves the construction of a PV power plant with an installed capacity of 0.6 MW and a SN cable line on plots Nos 125, 111, 67 and 117 within the municipality of Cyclists and the execution of a photovoltaic installation with an installed capacity of 0.031 MW covering the company’s own needs on electricity. Piasecka 32 A, Ktowel in the Municipality of Mełgiev. The applicant is entitled to the property on which the project will be...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2709:27, 9 March 2020DG Regio talk contribs 12,878 bytes +2,321 Created claim: summary (P836): The project involves the construction of a PV power plant with an installed capacity of 0.6 MW and a SN cable line on plots Nos 125, 111, 67 and 117 within the municipality of Cyclists and the execution of a photovoltaic installation with an installed capacity of 0.031 MW covering the company’s own needs on electricity. Piasecka 32 A, Ktowel in the Municipality of Mełgiev. The applicant is entitled to the property on which the project will be im...

24 February 2020

18 February 2020

31 January 2020

14 January 2020