Revision history of "Construction of photovoltaic installations for OPK Opole Lubelskie" (Q104832)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:1118:11, 8 October 2024DG Regio talk contribs 77,868 bytes −325 Set a claim value: summary (P836): 1---- o objetivo do projeto é reduzir o custo da eletricidade através da produção de eletricidade para as suas próprias necessidades. O objetivo será alcançado através da construção de cinco microinstalações fotovoltaicas, uma na estação de tratamento de águas residuais e quatro em estações de tratamento de águas, com uma capacidade total de 0,1244 MW. 2.---------Construção de micro instalações fotovoltaicas com uma capacidade de 0,1244 MW Custos qu...

22 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 11:2411:24, 27 July 2022DG Regio talk contribs 69,794 bytes +40,935 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 16,722 bytes +3,221 Created claim: summary (P836): 1---- L’objectif du projet est de réduire les coûts de l’électricité en produisant de l’électricité à des fins propres. L’objectif sera atteint par la construction de 5 micro-installations photovoltaïques, une sur le site de la station d’épuration et quatre dans des stations d’épuration d’une capacité totale de 0,1244 MW. 2.----------Concepts — construction d’installations microvoltaiques d’une capacité de 0,1244 MW Coûts admissibles 494 500,00...
  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 13,501 bytes +131 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 13,809 bytes +125 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 13,684 bytes −115 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 13,799 bytes +2,011 Created claim: summary (P836): 1---- the aim of the project is to reduce the cost of electricity by producing electricity for its own needs. The target will be achieved by the construction of 5 micro photovoltaic installations of one in the sewage treatment plant and four in water treatment stations with a total capacity of 0.1244 MW. 2.----------Those -construction of micro photovoltaic installations with a capacity of 0.1244 MW Qualified costs 494 500,00 PLN net. Grant 222...
  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 11,788 bytes −2,281 Removed claim: summary (P836): 1---- the aim of the project is to reduce the cost of electricity by producing electricity for own use. The target will be achieved by the construction of 5 micro photovoltaic installations within the waste water treatment plant and four at the water treatment plants with a total capacity of 0.1244 MW. 2.------------ Wash — Construction of micro-installations with a capacity of 0.1244 MW (PLN 494 500,00 net eligible costs). Net grant 222 525,0...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2709:27, 9 March 2020DG Regio talk contribs 12,775 bytes +2,281 Created claim: summary (P836): 1---- the aim of the project is to reduce the cost of electricity by producing electricity for own use. The target will be achieved by the construction of 5 micro photovoltaic installations within the waste water treatment plant and four at the water treatment plants with a total capacity of 0.1244 MW. 2.------------ Wash — Construction of micro-installations with a capacity of 0.1244 MW (PLN 494 500,00 net eligible costs). Net grant 222 525,00...

24 February 2020

18 February 2020

31 January 2020

14 January 2020