Revision history of "ECO – ENERGY IN HANNA MUNICIPALITY – STAGE II" (Q104824)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 15:5815:58, 10 October 2024DG Regio talk contribs 91,076 bytes +2 Changed label, description and/or aliases in pt
  • curprev 15:5815:58, 10 October 2024DG Regio talk contribs 91,074 bytes −323 Set a claim value: summary (P836): P. assume: Aquisição e montagem de 117 instalações de painéis solares (painéis planos de 2 painéis – 63,3 painéis – 43,4 painéis – 11 pcs), aquisição e montagem de 33 fornos alimentados a biomassa (2-10 kW, 12-15 kW, 13-20 kW, 2-25 kW, 4-30 kW), serviço de desenvolvimento de SW para efeitos de apresentação de candidaturas, serviço de documentação técnica para as necessidades de P. 600 habitantes de GH em 150 edifícios. O resultado é: Capacidade adic...

20 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 12:5312:53, 2 July 2022DG Regio talk contribs 80,224 bytes +50,660 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 17,128 bytes +3,136 Created claim: summary (P836): P. suppose: Achat et montage de 117 installations de collets solaires (type plat 2 panneaux — 63 pcs.,3 panneaux — 43 pcs.,4-panneaux -11 pcs.), Achat et montage de 33 fours de chauffage à biomasse (2-10 kW, 12-15 kW, 13-20 kW, 2-25 kW, 4-30 kW), service de développement SW aux fins de l’application, Service de documentation technique pour P., service d’exécution du site internet pour les besoins de P., service de supervision des investisseurs,...
  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 13,992 bytes +119 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 14,312 bytes +108 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 14,204 bytes −108 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 14,312 bytes +2,565 Created claim: summary (P836): P. assumes: Purchase and assembly of 117 solar colls installations (flat type 2-panel – 63,3 panels – 43,4-panel -11 pcs), Purchase and assembly of 33 biomass-fired furnaces (2-10 kW, 12-15 kW, 13-20 kW, 2-25 kW, 4-30 kW), the service of the development of SW for the purpose of submitting applications, the service of technical documentation for the needs of P. 600 inhabitants of GH in 150 buildings. The result is: Additional capacity to generate...
  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 11,747 bytes −1,999 Removed claim: summary (P836): P. assumes: The purchase and installation of 117 solar cable installations (flat panel 2-panel — 63 units, 3 panel 43, 4 panel — 11 units), Purchase and installation of 33 biomass furnaces (2-10 kW, 12-15 kW, 13-20 kW, 2-25 kW, 4-30 kW), UDS for submission of applications, performance of technical documentation for the needs of P., Service delivery service. 600 inhabitants of GH in 150 sites. The result is: Additional renewable generation capa...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2709:27, 9 March 2020DG Regio talk contribs 12,464 bytes +1,999 Created claim: summary (P836): P. assumes: The purchase and installation of 117 solar cable installations (flat panel 2-panel — 63 units, 3 panel 43, 4 panel — 11 units), Purchase and installation of 33 biomass furnaces (2-10 kW, 12-15 kW, 13-20 kW, 2-25 kW, 4-30 kW), UDS for submission of applications, performance of technical documentation for the needs of P., Service delivery service. 600 inhabitants of GH in 150 sites. The result is: Additional renewable generation capaci...

24 February 2020

18 February 2020

31 January 2020

14 January 2020