Revision history of "Renewable energy sources in the municipality of Rejowiec" (Q104821)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 15:5815:58, 10 October 2024DG Regio talk contribs 92,537 bytes −90 Set a claim value: summary (P836): O objeto do projeto é a construção de microinstalações de FER, que serão utilizadas por agregados familiares e edifícios públicos da área da comuna de Rejowiec. As tarefas a realizar incluirão a construção de: 1) Instalações fotovoltaicas para 50 edifícios, incluindo 3 edifícios. 2) Instalação solar de dois colectores solares com um reservatório de 200 litros para 215 edifícios; 3) Instalação solar de três colectores solares com um tanque de 300 lit...

7 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 12:5312:53, 2 July 2022DG Regio talk contribs 86,569 bytes +56,297 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 17,529 bytes +3,178 Created claim: summary (P836): L’objet du projet est la construction de micro-installations de SER qui seront utilisées par les ménages et les bâtiments publics de la zone de la municipalité de Rejowiec. Les tâches à accomplir comprendront la construction de: 1) installations photovoltaïques pour 50 bâtiments, dont 3 bâtiments utilisés. publ.; 2) Installation solaire de deux capteurs solaires avec réservoir de 200 litres pour 215 bâtiments; 3) Installation solaire de trois ca...
  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 14,351 bytes +127 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 14,663 bytes +115 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 14,548 bytes −114 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 14,662 bytes +2,873 Created claim: summary (P836): The subject of the project is the construction of micro-installations of RES, which will be used by households and public buildings from the area of Rejowiec commune. The tasks to be carried out will include the construction of: 1) Photovoltaic installations for 50 buildings, including 3 buildings. publ.; 2) Solar installation of two solar collectors with a tank of 200 litres for 215 buildings; 3) Solar installation of three solar collectors wit...
  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 11,789 bytes −2,468 Removed claim: summary (P836): The object of the project is the construction of micro-RES facilities to be used by households and buildings of general interest from the municipality of Rejwiec. The tasks to be carried out will include the building of: 1) photovoltaic installations for 50 buildings, including 3 buildings used in publ.; 2) solar thermal collectors installation with a reservoir of 200 litres for 215 buildings; (3) Solar solar collectors’ three solar collectors...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2709:27, 9 March 2020DG Regio talk contribs 12,974 bytes +2,468 Created claim: summary (P836): The object of the project is the construction of micro-RES facilities to be used by households and buildings of general interest from the municipality of Rejwiec. The tasks to be carried out will include the building of: 1) photovoltaic installations for 50 buildings, including 3 buildings used in publ.; 2) solar thermal collectors installation with a reservoir of 200 litres for 215 buildings; (3) Solar solar collectors’ three solar collectors w...

24 February 2020

18 February 2020

31 January 2020

14 January 2020