Revision history of "Pure energy in Luków III" (Q104811)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 12:5312:53, 2 July 2022DG Regio talk contribs 80,290 bytes +51,806 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 16,869 bytes +2,934 Created claim: summary (P836): La tâche principale du projet est de remplacer la production d’énergie fossile existante par des énergies renouvelables. 53 installations de capteurs solaires (1 deux panneaux d’une puissance de 3,1 KW, 51 trois panneaux d’une capacité de 4,7 KW, 1 quatre panneaux d’une puissance de 6,2 KW) et 308 installations photovoltaïques ouvertes d’une capacité de 2,32 KW seront réalisées. La capacité totale installée de l’équipement sera de 0,96 MW. Dimin...
  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 13,935 bytes +111 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 14,263 bytes +84 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 14,179 bytes −92 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 14,271 bytes +2,636 Created claim: summary (P836): The main task of the project is to replace the existing production of fossil energy from renewable sources. There will be 53 solar collector installations (1 two-panel with a capacity of 3.1 KW, 51 three-panel with a capacity of 4.7 KW, 1 four-panel with a capacity of 6.2 KW) and 308 open photovoltaic installations of 2.32 KW. The total installed power of the devices will be 0,96 MW. Estimated reduction of CO2 emissions into the atmosphere: 536,...
  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 11,635 bytes −2,148 Removed claim: summary (P836): The primary task of the project is to replace the existing fossil fuel production from renewable raw materials. 53 solar collectors installations (1 two panels with a power of 3,1 KW, 51 panel with a power of 4,7 KW, 1 four panel 6,2 TA) and 308 open photovoltaic installations of 2,32 KW. The total installed capacity of the equipment will be 0.96 MW. Estimated decrease of CO2 emissions in the atmosphere: 536,18 tonnes per year. All installatio...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2709:27, 9 March 2020DG Regio talk contribs 12,497 bytes +2,148 Created claim: summary (P836): The primary task of the project is to replace the existing fossil fuel production from renewable raw materials. 53 solar collectors installations (1 two panels with a power of 3,1 KW, 51 panel with a power of 4,7 KW, 1 four panel 6,2 TA) and 308 open photovoltaic installations of 2,32 KW. The total installed capacity of the equipment will be 0.96 MW. Estimated decrease of CO2 emissions in the atmosphere: 536,18 tonnes per year. All installations...

24 February 2020

18 February 2020

31 January 2020

14 January 2020