Revision history of "Pure energy in Luków II" (Q104810)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:1118:11, 8 October 2024DG Regio talk contribs 87,039 bytes −16 Changed label, description and/or aliases in pt
  • curprev 18:1118:11, 8 October 2024DG Regio talk contribs 87,055 bytes −8 Set a claim value: summary (P836): A principal tarefa do projeto é substituir a produção existente de energia fóssil a partir de fontes renováveis. Haverá 491 instalações de colectores solares (239 dois painéis com uma capacidade de 3,1 KW, 210 três painéis com 4,7 KW, 42 quatro painéis com uma capacidade de 6,2 KW) e três instalações fotovoltaicas abertas com uma capacidade de 2,32 KW. A potência total instalada dos dispositivos será de 1,98 MW. A redução estimada das emissões de CO...

20 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 12:5312:53, 2 July 2022DG Regio talk contribs 81,637 bytes +52,756 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 17,050 bytes +2,994 Created claim: summary (P836): La tâche principale du projet est de remplacer la production d’énergie fossile existante par des énergies renouvelables. 491 capteurs solaires (239 panneaux à deux panneaux d’une capacité de 3,1 KW, 210 trois panneaux d’une capacité de 4,7 KW, 42 quatre panneaux d’une capacité de 6,2 KW) et trois installations photovoltaïques ouvertes d’une capacité de 2,32 KW seront mis en œuvre. La capacité totale installée de l’équipement sera de 1,98 MW. La...
  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 14,056 bytes +110 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 14,385 bytes +83 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 14,302 bytes −96 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 14,398 bytes +2,704 Created claim: summary (P836): The main task of the project is to replace the existing production of fossil energy from renewable sources. There will be 491 solar collector installations (239 two-panel with a capacity of 3.1 KW, 210 three-panel with 4.7 KW, 42 four panels with a capacity of 6.2 KW) and three open photovoltaic installations with a capacity of 2.32 KW. The total installed power of the devices will be 1,98 MW. The estimated reduction in CO2 emissions to the atmo...
  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 11,694 bytes −2,179 Removed claim: summary (P836): The primary task of the project is to replace the existing fossil fuel production from renewable raw materials. 491 solar collectors will be installed (239 panel 3,1 KW, 210 panel with 4,7 KW, 42 four panel 6,2 TA) and three open solar installations with a power of 2,32 KW. The total installed capacity of the equipment will be 1.98 MW. The estimated decrease in CO2 emissions will be 274,32 tonnes per year. All installations will be located on...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2709:27, 9 March 2020DG Regio talk contribs 12,588 bytes +2,179 Created claim: summary (P836): The primary task of the project is to replace the existing fossil fuel production from renewable raw materials. 491 solar collectors will be installed (239 panel 3,1 KW, 210 panel with 4,7 KW, 42 four panel 6,2 TA) and three open solar installations with a power of 2,32 KW. The total installed capacity of the equipment will be 1.98 MW. The estimated decrease in CO2 emissions will be 274,32 tonnes per year. All installations will be located on ro...

24 February 2020

18 February 2020

31 January 2020

14 January 2020