Revision history of "Pure energy in the Luków Town I" (Q104809)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 11:2411:24, 27 July 2022DG Regio talk contribs 81,990 bytes +53,127 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 17,073 bytes +2,994 Created claim: summary (P836): La tâche principale du projet est de remplacer la production d’énergie fossile existante par des énergies renouvelables. 491 capteurs solaires (239 panneaux à deux panneaux d’une capacité de 3,1 KW), 210 trois panneaux d’une capacité de 4,7 KW, 42 quatre panneaux d’une capacité de 6,2 KW et trois installations photovoltaïques ouvertes d’une capacité de 2,32 KW seront mis en œuvre. La capacité totale installée de l’équipement sera de 1,98 MW. La...
  • curprev 09:1209:12, 1 December 2021DG Regio talk contribs 14,079 bytes +109 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 14,409 bytes +91 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 14,318 bytes −90 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 14,408 bytes +2,720 Created claim: summary (P836): The main task of the project is to replace the existing production of fossil energy from renewable sources. There will be 491 solar collector installations (239 two-panel with a capacity of 3.1 KW), 210 three panels with a capacity of 4.7 KW, 42 four panels with a capacity of 6.2 KW) and three open photovoltaic installations with a capacity of 2.32 KW. The total installed power of the devices will be 1,98 MW. The estimated reduction in CO2 emiss...
  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 11,688 bytes −2,204 Removed claim: summary (P836): The primary task of the project is to replace the existing fossil fuel production from renewable raw materials. 491 solar collectors will be installed (239 panel 3,1 TA), 210 panel three panels with a power of 4,7 KW, 42 four panel 6,2 TA) and three open solar installations with a power of 2,32 KW. The total installed capacity of the equipment will be 1.98 MW. The estimated decrease in CO2 emissions will be 283,13 tonnes per year. All installa...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2709:27, 9 March 2020DG Regio talk contribs 12,607 bytes +2,204 Created claim: summary (P836): The primary task of the project is to replace the existing fossil fuel production from renewable raw materials. 491 solar collectors will be installed (239 panel 3,1 TA), 210 panel three panels with a power of 4,7 KW, 42 four panel 6,2 TA) and three open solar installations with a power of 2,32 KW. The total installed capacity of the equipment will be 1.98 MW. The estimated decrease in CO2 emissions will be 283,13 tonnes per year. All installati...

24 February 2020

18 February 2020

31 January 2020

14 January 2020