Revision history of "We're turning on good energy! Construction of small RES installations in Biała Podlaska." (Q104806)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:0018:00, 9 October 2024DG Regio talk contribs 90,144 bytes −6 Changed label, description and/or aliases in pt
  • curprev 18:0018:00, 9 October 2024DG Regio talk contribs 90,150 bytes −161 Set a claim value: summary (P836): O projeto incluirá 829 instalações FER, incluindo: — 304 conjuntos de coletores solares com uma potência total de 1,15 MW, — 201 instalações fotovoltaicas com uma potência total de 0,64 MW. — 228 bombas de calor de ar com uma capacidade total de 0,39 MW, — 96 fornos de biomassa com uma capacidade total de 1,52 MW. Capacidade total instalada de energia térmica: 3,06 MW, elétricos: 0,64 MW. Os coletores solares e fotovoltaicos estarão localizados em p...

23 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1519:15, 2 March 2023DG Regio talk contribs 87,914 bytes +2,219 Changed label, description and/or aliases in da, it, sk, sv, fi, lv, sl, cs, ro, de, pt, fr, hr, lt, nl, es, hu, bg, et, ga, el, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 11:2411:24, 27 July 2022DG Regio talk contribs 83,580 bytes +53,966 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1209:12, 1 December 2021DG Regio talk contribs 17,244 bytes +3,061 Created claim: summary (P836): Dans le cadre du projet, 829 installations SER seront mises en œuvre, dont: — 304 ensembles de capteurs solaires d’une capacité totale de 1,15 MW, — 201 installations photovoltaïques d’une capacité totale de 0,64 MW. — 228 pompes à chaleur à air d’une capacité totale de 0,39 MW, — 96 fours à biomasse d’une capacité totale de 1,52 MW. Capacité totale installée pour l’énergie thermique: 3,06 MW, électrique: 0,64 MW. Les ensembles de collecteurs so...
  • curprev 09:1209:12, 1 December 2021DG Regio talk contribs 14,183 bytes +151 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 14,471 bytes +148 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 14,323 bytes −142 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 14,465 bytes +2,644 Created claim: summary (P836): The project will include 829 RES installations, including: — 304 sets of solar collectors with a total power of 1.15 MW, – 201 photovoltaic installations with a total power of 0.64 MW. — 228 air heat pumps with a total capacity of 0.39 MW, – 96 biomass furnaces with a total capacity of 1,52 MW. Total installed capacity for thermal energy: 3,06 MW, electric: 0,64 MW. Solar and photovoltaic collectors will be located in part on the facades and roo...
  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 11,821 bytes −2,326 Removed claim: summary (P836): 829 RES installations will be implemented as part of the project, including: — 304 solar collectors units with a total capacity of 1.15 MW, — 201 photovoltaic installations with a total capacity of 0.64 MW. 228 heat pumps with a total capacity of 0.39 MW, — 96 biomass furnaces with a total capacity of 1.52 MW. Total installed capacity for thermal energy: 3.06 MW, electric: 0.64 MW. The solar and solar collectors kits will be located on the faç...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2709:27, 9 March 2020DG Regio talk contribs 12,863 bytes +2,326 Created claim: summary (P836): 829 RES installations will be implemented as part of the project, including: — 304 solar collectors units with a total capacity of 1.15 MW, — 201 photovoltaic installations with a total capacity of 0.64 MW. 228 heat pumps with a total capacity of 0.39 MW, — 96 biomass furnaces with a total capacity of 1.52 MW. Total installed capacity for thermal energy: 3.06 MW, electric: 0.64 MW. The solar and solar collectors kits will be located on the façad...

24 February 2020

18 February 2020

31 January 2020

14 January 2020