Revision history of "SŁAWATYCZE – COMMUNE WITH ENERGY" (Q104797)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:1115:11, 7 October 2024DG Regio talk contribs 88,764 bytes +1 Changed label, description and/or aliases in pt
  • curprev 15:1115:11, 7 October 2024DG Regio talk contribs 88,763 bytes +31 Set a claim value: summary (P836): O projeto diz respeito à construção de instalações FER em todas as cidades do município de Sławatycze. As instalações estarão localizadas em edifícios públicos: Escritório municipal e estação de tratamento de águas residuais (fotovoltaica 2 x 10 kW), e em edifícios unifamiliares: fotovoltaico 21 X 2 kW; 41 X 3 kW; caldeiras a biomassa: 5 x 15 kW; 9 X 25 kW; 3 X 35 kW; instalações solares 90 x 2,8 kW, 68 x 4,2 kW; 22 X 5,6 kW; bombas de calor para aq...

7 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 12:5212:52, 2 July 2022DG Regio talk contribs 84,676 bytes +55,029 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1209:12, 1 December 2021DG Regio talk contribs 17,380 bytes +3,235 Created claim: summary (P836): Le projet concerne la construction d’installations SER dans toutes les villes de la commune de Sławatycze. Les installations seront situées sur des bâtiments publics: bureaux municipaux et station d’épuration des eaux usées (photovoltaïque 2 x 10 kW) et dans les bâtiments unifamiliaux: photovoltaïque 21 X 2 kW; 41 X 3 kW; chaudières à biomasse: 5 x 15 kW; 9 x 25 kW; 3 X 35 kW; systèmes solaires 90 x 2,8 kW, 68 X 4,2 kW; 22 x 5,6 kW; pompes à cha...
  • curprev 09:1209:12, 1 December 2021DG Regio talk contribs 14,145 bytes +102 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:5716:57, 17 October 2020DG Regio talk contribs 14,482 bytes +94 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5716:57, 17 October 2020DG Regio talk contribs 14,388 bytes −97 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5716:57, 17 October 2020DG Regio talk contribs 14,485 bytes +2,782 Created claim: summary (P836): The project concerns the construction of RES installations in all towns of Sławatycze commune. The installations will be located on public buildings: municipal Office and sewage treatment plant (photovoltaics 2 x 10 kW), and in single-family buildings: photovoltaic 21 X 2 kW; 41 X 3 kW; biomass boilers: 5 x 15 kW; 9 X 25 kW; 3 X 35 kW; solar installations 90 x 2,8 kW, 68 X 4,2 kW; 22 X 5,6 kW; heat pumps for central heating 54 X 2 kW. The power...
  • curprev 16:5716:57, 17 October 2020DG Regio talk contribs 11,703 bytes −2,406 Removed claim: summary (P836): The project concerns the construction of RES installations in all the municipalities of Sławafanae. Installations will be located on public buildings: municipal and waste water treatment plant (photovoltaic 2 x 10 kW), and in single-family buildings: photovoltaics 21 X 2 kW; 41 X 3 kW; biomass boilers: 5 x 15 kW; 9 X 25 kW; 3 X 35 kW; solar installations 90 x 2.8 kW, 68 X 4.2 kW; 22 X 5.6 kW; heat pumps do hot. 54 X 2 kW. The power of the inst...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2709:27, 9 March 2020DG Regio talk contribs 12,825 bytes +2,406 Created claim: summary (P836): The project concerns the construction of RES installations in all the municipalities of Sławafanae. Installations will be located on public buildings: municipal and waste water treatment plant (photovoltaic 2 x 10 kW), and in single-family buildings: photovoltaics 21 X 2 kW; 41 X 3 kW; biomass boilers: 5 x 15 kW; 9 X 25 kW; 3 X 35 kW; solar installations 90 x 2.8 kW, 68 X 4.2 kW; 22 X 5.6 kW; heat pumps do hot. 54 X 2 kW. The power of the instal...

24 February 2020

18 February 2020

31 January 2020

14 January 2020